ITAC Assessment: SD0341
ITAC logo
ITAC Assessment: SD0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fluid meters and counters
NAICS 334514: Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 60,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 5,775
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,501 566,412
kWh
Electricity Demand $28,062 2,115
kW-mo/yr
Natural Gas $15,126 1,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $961 $600 $576
5,983
kWh
$385
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $570 $200 $570
5,920
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,274 $3,721 $5,274
54,821
kWh
- -
04 2.7135: Install occupancy sensors $965 $400 $965
10,031
kWh
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,607 $10,000 - - $5,607
-
lb
TOTAL RECOMMENDED $13,377 $14,921 $7,385
76,755
kWh
$385
-
kW-mo/yr
$5,607
-
lb
TOTAL IMPLEMENTED $1,535 $600 $1,535
15,951
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs