ITAC Assessment: OK0474
ITAC logo
ITAC Assessment: OK0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pier systems
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 98,285
ft2
Annual Production 300
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,907 599,062
kWh
Natural Gas $70,986 13,359
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,314

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2135: Repair and eliminate steam leaks $4,457 $4,457 - $4,232
-
MMBtu
$225
02 2.1321: Replace fossil fuel equipment with electrical equipment $3,632 $3,553 - $3,632
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,391 $50 $1,391
26,084
kWh
- -
04 2.2136: Install / repair insulation on steam lines $1,280 $1,819 - $1,280
-
MMBtu
-
05 2.7124: Make a practice of turning off lights when not needed $554 - $554
10,258
kWh
- -
TOTAL RECOMMENDED $11,314 $9,879 $1,945
36,342
kWh
$9,144
-
MMBtu
$225
TOTAL IMPLEMENTED $11,314 $9,879 $1,945
36,342
kWh
$9,144
-
MMBtu
$225
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs