ITAC Assessment: SD0340
ITAC logo
ITAC Assessment: SD0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Spa electrical equipment and heaters
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 87,000
ft2
Annual Production 525,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,701 1,509,987
kWh
Electricity Demand $48,372 5,494
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,616

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7229: Air condition only space necessary $8,521 $3,790 $6,496
58,160
kWh
$2,025
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,560 $570 $1,560
13,950
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,177 - - - $3,177
04 2.4239: Eliminate or reduce compressed air usage $393 - $393
3,514
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,663 $23,543 $4,316
38,640
kWh
$1,347
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $989 $400 $751
6,720
kWh
$238
-
kW-mo/yr
-
TOTAL RECOMMENDED $20,303 $28,303 $13,516
120,984
kWh
$3,610
-
kW-mo/yr
$3,177
TOTAL IMPLEMENTED $7,616 $24,113 $6,269
56,104
kWh
$1,347
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs