| Assessment Year | 2004 |
|---|---|
| Principal Product | Spa electrical equipment and heaters |
| NAICS | 334419: Other Electronic Component Manufacturing |
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
87,000
ft2
|
| Annual Production | 525,000
pieces
|
| Production Hrs. Annual | 2,750
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $168,701 | 1,509,987 |
kWh
|
$0.11 |
| Electricity Demand | $48,372 | 5,494 |
kW-mo/yr
|
$8.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,616 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7229: Air condition only space necessary | $8,521 | $3,790 |
$6,496
58,160
kWh
|
$2,025
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,560 | $570 |
$1,560
13,950
kWh
|
- | - | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,177 | - | - | - | $3,177 | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $393 | - |
$393
3,514
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,663 | $23,543 |
$4,316
38,640
kWh
|
$1,347
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $989 | $400 |
$751
6,720
kWh
|
$238
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $20,303 | $28,303 |
$13,516
120,984
kWh
|
$3,610
-
kW-mo/yr
|
$3,177 | ||
| TOTAL IMPLEMENTED | $7,616 | $24,113 |
$6,269
56,104
kWh
|
$1,347
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs