ITAC Assessment: SD0339
ITAC logo
ITAC Assessment: SD0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Medical instraments
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 43,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 7,350
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $353,654 3,907,899
kWh
Electricity Demand $131,093 8,892
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,112 $320 $15,112
166,999
kWh
- -
02 2.4131: Size electric motors for peak operating efficiency $8,250 $2,570 $6,776
58,581
kWh
$1,474
-
kW-mo/yr
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $3,831 - $3,831
42,336
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $477 $1,700 $477
5,274
kWh
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,362 $10,000 n/a - - $10,362
-
lb
TOTAL RECOMMENDED $38,032 $14,590 $26,196
273,190
kWh
$1,474
-
kW-mo/yr
$10,362
-
lb
TOTAL IMPLEMENTED $18,943 $320 $18,943
209,335
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs