Assessment Year | 1997 |
---|---|
Principal Product | Metalworking |
NAICS |
n/a
|
SIC | 3549: Metalworking Machinery, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 53 |
Plant Area |
70,000
ft2
|
Annual Production | 55,000
ton
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,999 | 1,065,944 |
kWh
|
$0.038 |
Electricity Demand | $37,201 | 4,631 |
kW-mo/yr
|
$8.03 |
Electricity Fees | $134 | - |
|
- |
Fuel Oil #4 | $24,000 | 5,560 |
MMBtu
|
$4.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $488 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,576 | $2,296 |
$852
22,860
kWh
|
$724
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $992 | $789 |
$992
26,377
kWh
|
- | - | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $488 | $40,000 |
$488
12,896
kWh
|
- | - | - | |
04 | 3.6192: Use a less expensive method of waste removal | $421 | - | - | - |
$421
-
gal
|
- | |
05 | 3.5313: Increase amount of waste recovered for resale | $1,375 | - | - | - | - |
$1,375
-
lb
|
|
TOTAL RECOMMENDED | $4,852 | $43,085 |
$2,332
62,133
kWh
|
$724
-
kW-mo/yr
|
$421
-
gal
|
$1,375
-
lb
|
||
TOTAL IMPLEMENTED | $488 | $40,000 |
$488
12,896
kWh
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs