ITAC Assessment: SD0333
ITAC logo
ITAC Assessment: SD0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product molded rubber
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 80,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $582,671 5,414,543
kWh
Electricity Demand $167,205 13,124
kW-mo/yr
Natural Gas $7,132 500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,979 $15,000 $15,817
147,000
kWh
$3,746
-
kW-mo/yr
$(-4,584.0)
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $14,470 $600 $14,470
134,458
kWh
- - - -
03 2.7124: Make a practice of turning off lights when not needed $7,390 - $7,390
68,720
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,253 $192 $3,438
31,950
kWh
$815
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,128 - $2,542
23,621
kWh
$586
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,645 $3,125 $2,645
24,585
kWh
- - - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,600 $15,000 - - - $6,600
-
lb
-
08 3.2176: Increase use of automation $57,000 $110,000 - - - - $57,000
TOTAL RECOMMENDED $110,465 $143,917 $46,302
430,334
kWh
$5,147
-
kW-mo/yr
$(-4,584.0)
-
MMBtu
$6,600
-
lb
$57,000
TOTAL IMPLEMENTED $78,851 $110,792 $20,450
190,029
kWh
$1,401
-
kW-mo/yr
- - $57,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs