ITAC Assessment: OR0279
ITAC logo
ITAC Assessment: OR0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Popsicles, Frozen Fruit Bars
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 85,360
ft2
Annual Production 33,000,000
pieces
Production Hrs. Annual 6,300
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,064 1,355,803
kWh
Electricity Demand $13,326 3,756
kW-mo/yr
Electricity Fees $4,525 -
Natural Gas $14,630 3,272
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $1,604 - $1,604
71,219
kWh
- - - - -
02 3.5212: Regrind, reuse, or sell scrap plastic parts $661 - - - - - $661
-
lb
-
03 3.4154: Eliminate leaks in water lines and valves $4,754 $750 - - - $3,260
-
Tgal
- $1,494
-
Tgal
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $272 $242 - - $272
-
MMBtu
- - -
05 2.1232: Keep boiler tubes clean $1,349 $1,500 - - $1,349
-
MMBtu
- - -
06 2.4133: Use most efficient type of electric motors $264 $738 $176
7,913
kWh
$88
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $8,904 $3,230 $1,780
79,132
kWh
$88
-
kW-mo/yr
$1,621
-
MMBtu
$3,260
-
Tgal
$661
-
lb
$1,494
-
Tgal
TOTAL IMPLEMENTED $7,707 $2,250 $1,604
71,219
kWh
- $1,349
-
MMBtu
$3,260
-
Tgal
- $1,494
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs