| Assessment Year | 1996 |
|---|---|
| Principal Product | Popsicles, Frozen Fruit Bars |
| NAICS |
n/a
|
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $1 M to 5M |
| # of Employees | 65 |
| Plant Area |
85,360
ft2
|
| Annual Production | 33,000,000
pieces
|
| Production Hrs. Annual | 6,300
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $30,064 | 1,355,803 |
kWh
|
$0.022 |
| Electricity Demand | $13,326 | 3,756 |
kW-mo/yr
|
$3.55 |
| Electricity Fees | $4,525 | - |
|
- |
| Natural Gas | $14,630 | 3,272 |
MMBtu
|
$4.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,904 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,707 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,604 | - |
$1,604
71,219
kWh
|
- | - | - | - | - | |
| 02 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $661 | - | - | - | - | - |
$661
-
lb
|
- | |
| 03 | 3.4154: Eliminate leaks in water lines and valves | $4,754 | $750 | - | - | - |
$3,260
-
Tgal
|
- |
$1,494
-
Tgal
|
|
| 04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $272 | $242 | - | - |
$272
-
MMBtu
|
- | - | - | |
| 05 | 2.1232: Keep boiler tubes clean | $1,349 | $1,500 | - | - |
$1,349
-
MMBtu
|
- | - | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $264 | $738 |
$176
7,913
kWh
|
$88
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $8,904 | $3,230 |
$1,780
79,132
kWh
|
$88
-
kW-mo/yr
|
$1,621
-
MMBtu
|
$3,260
-
Tgal
|
$661
-
lb
|
$1,494
-
Tgal
|
||
| TOTAL IMPLEMENTED | $7,707 | $2,250 |
$1,604
71,219
kWh
|
- |
$1,349
-
MMBtu
|
$3,260
-
Tgal
|
- |
$1,494
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs