ITAC Assessment: SD0331
ITAC logo
ITAC Assessment: SD0331
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Paper
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 70,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,403 666,840
kWh
Electricity Demand $11,616 1,416
kW-mo/yr
LPG $4,681 500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7134: Use photocell controls $4,358 $410 $4,358
34,836
kWh
- - -
02 2.6218: Turn off equipment when not in use $643 $453 $643
2,200
kWh
- - -
03 2.6218: Turn off equipment when not in use $204 - $163
1,306
kWh
$41
-
kW-mo/yr
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,220 $5,000 - - $2,220
-
lb
-
05 4.441: Install automatic packing equipment $108,200 $110,000 - - - $108,200
TOTAL RECOMMENDED $115,625 $115,863 $5,164
38,342
kWh
$41
-
kW-mo/yr
$2,220
-
lb
$108,200
TOTAL IMPLEMENTED $110,420 $115,000 - - $2,220
-
lb
$108,200
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs