ITAC Assessment: SD0328
ITAC logo
ITAC Assessment: SD0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product cake and bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 60,000
ft2
Annual Production 20
ton
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,516 2,960,102
kWh
Electricity Demand $90,643 6,925
kW-mo/yr
Natural Gas $98,835 18,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $752,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $272,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $269,910 $1,371,000 $164,454
1,865,460
kWh
$71,786
-
kW-mo/yr
$33,670
-
MMBtu
- - -
02 2.7145: Install skylights $5,260 $6,650 $2,556
28,980
kWh
$2,704
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,323 - $1,616
18,321
kWh
$707
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $747 $400 $363
4,120
kWh
$384
-
kW-mo/yr
- - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $12,600 $11,000 - - - $12,600
-
lb
- -
06 3.1192: Reduce scrap production $4,246 $342 - - - - - $4,246
07 4.441: Install automatic packing equipment $401,960 $800,000 - - - - $401,960 -
08 2.5194: Redesign process $55,557 $24,000 - - - - $55,557 -
TOTAL RECOMMENDED $752,603 $2,213,392 $168,989
1,916,881
kWh
$75,581
-
kW-mo/yr
$33,670
-
MMBtu
$12,600
-
lb
$457,517 $4,246
TOTAL IMPLEMENTED $272,233 $1,371,000 $166,070
1,883,781
kWh
$72,493
-
kW-mo/yr
$33,670
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs