| Assessment Year | 2003 |
|---|---|
| Principal Product | cake and bread |
| NAICS | 311812: Commercial Bakeries |
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
60,000
ft2
|
| Annual Production | 20
ton
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $259,516 | 2,960,102 |
kWh
|
$0.088 |
| Electricity Demand | $90,643 | 6,925 |
kW-mo/yr
|
$13.09 |
| Natural Gas | $98,835 | 18,680 |
MMBtu
|
$5.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $752,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $272,233 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $269,910 | $1,371,000 |
$164,454
1,865,460
kWh
|
$71,786
-
kW-mo/yr
|
$33,670
-
MMBtu
|
- | - | - | |
| 02 | 2.7145: Install skylights | $5,260 | $6,650 |
$2,556
28,980
kWh
|
$2,704
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,323 | - |
$1,616
18,321
kWh
|
$707
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.7135: Install occupancy sensors | $747 | $400 |
$363
4,120
kWh
|
$384
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $12,600 | $11,000 | - | - | - |
$12,600
-
lb
|
- | - | |
| 06 | 3.1192: Reduce scrap production | $4,246 | $342 | - | - | - | - | - | $4,246 | |
| 07 | 4.441: Install automatic packing equipment | $401,960 | $800,000 | - | - | - | - | $401,960 | - | |
| 08 | 2.5194: Redesign process | $55,557 | $24,000 | - | - | - | - | $55,557 | - | |
| TOTAL RECOMMENDED | $752,603 | $2,213,392 |
$168,989
1,916,881
kWh
|
$75,581
-
kW-mo/yr
|
$33,670
-
MMBtu
|
$12,600
-
lb
|
$457,517 | $4,246 | ||
| TOTAL IMPLEMENTED | $272,233 | $1,371,000 |
$166,070
1,883,781
kWh
|
$72,493
-
kW-mo/yr
|
$33,670
-
MMBtu
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs