ITAC Assessment: SD0324
ITAC logo
ITAC Assessment: SD0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product plastic and rubber products
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 50,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,456 872,677
kWh
Electricity Demand $26,444 3,147
kW-mo/yr
Natural Gas $15,083 2,547
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,504

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,616 $22,450 $18,616
148,220
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,814 $6,400 $13,061
103,991
kWh
$753
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,480 $18,000 $10,761
85,680
kWh
$3,719
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $7,504 $70 $7,504
59,746
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $1,158 $1,500 $1,158
9,222
kWh
- -
06 3.5212: Regrind, reuse, or sell scrap plastic parts $18,027 $1,500 - - $18,027
-
lb
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,540 $5,000 - - $9,540
-
lb
TOTAL RECOMMENDED $83,139 $54,920 $51,100
406,859
kWh
$4,472
-
kW-mo/yr
$27,567
-
lb
TOTAL IMPLEMENTED $7,504 $70 $7,504
59,746
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs