| Assessment Year | 2003 |
|---|---|
| Principal Product | plastic and rubber products |
| NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
| SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
| Sales Range | $5 M to 10M |
| # of Employees | 30 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $109,456 | 872,677 |
kWh
|
$0.13 |
| Electricity Demand | $26,444 | 3,147 |
kW-mo/yr
|
$8.40 |
| Natural Gas | $15,083 | 2,547 |
MMBtu
|
$5.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $83,139 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,504 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,616 | $22,450 |
$18,616
148,220
kWh
|
- | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,814 | $6,400 |
$13,061
103,991
kWh
|
$753
-
kW-mo/yr
|
- | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,480 | $18,000 |
$10,761
85,680
kWh
|
$3,719
-
kW-mo/yr
|
- | |
| 04 | 2.6218: Turn off equipment when not in use | $7,504 | $70 |
$7,504
59,746
kWh
|
- | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $1,158 | $1,500 |
$1,158
9,222
kWh
|
- | - | |
| 06 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $18,027 | $1,500 | - | - |
$18,027
-
lb
|
|
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $9,540 | $5,000 | - | - |
$9,540
-
lb
|
|
| TOTAL RECOMMENDED | $83,139 | $54,920 |
$51,100
406,859
kWh
|
$4,472
-
kW-mo/yr
|
$27,567
-
lb
|
||
| TOTAL IMPLEMENTED | $7,504 | $70 |
$7,504
59,746
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs