ITAC Assessment: SD0322
ITAC logo
ITAC Assessment: SD0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product PVC Sheet Manufacturing
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 217,800
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $321,124 2,834,955
kWh
Electricity Demand $97,538 7,238
kW-mo/yr
Natural Gas $18,220 3,473
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $294,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $24,193 - - $10,033
-
kW-mo/yr
$14,160 - - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,151 $6,000 $10,091
88,906
kWh
$2,060
-
kW-mo/yr
- - - - -
03 2.7145: Install skylights $4,917 $6,000 $3,908
34,434
kWh
$3,131
-
kW-mo/yr
- $(-2,122.0)
-
MMBtu
- - -
04 2.6218: Turn off equipment when not in use $5,952 - $5,952
52,441
kWh
- - - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,614 $2,250 $3,273
28,835
kWh
$341
-
kW-mo/yr
- - - - -
06 2.2511: Insulate bare equipment $579 $350 $579
5,102
kWh
- - - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,321 $240 $1,928
16,984
kWh
$393
-
kW-mo/yr
- - - - -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,814 $5,000 - - - - $2,814
-
lb
- -
09 4.521: Clear and rent existing space $238,320 $11,000 - - - - - $220,320 $18,000
TOTAL RECOMMENDED $294,861 $30,840 $25,731
226,702
kWh
$15,958
-
kW-mo/yr
$14,160 $(-2,122.0)
-
MMBtu
$2,814
-
lb
$220,320 $18,000
TOTAL IMPLEMENTED $8,273 $240 $7,880
69,425
kWh
$393
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs