Assessment Year | 2003 |
---|---|
Principal Product | PVC Sheet Manufacturing |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
217,800
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $321,124 | 2,834,955 |
kWh
|
$0.11 |
Electricity Demand | $97,538 | 7,238 |
kW-mo/yr
|
$13.48 |
Natural Gas | $18,220 | 3,473 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $294,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,273 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $24,193 | - | - |
$10,033
-
kW-mo/yr
|
$14,160 | - | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,151 | $6,000 |
$10,091
88,906
kWh
|
$2,060
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7145: Install skylights | $4,917 | $6,000 |
$3,908
34,434
kWh
|
$3,131
-
kW-mo/yr
|
- |
$(-2,122.0)
-
MMBtu
|
- | - | - | |
04 | 2.6218: Turn off equipment when not in use | $5,952 | - |
$5,952
52,441
kWh
|
- | - | - | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,614 | $2,250 |
$3,273
28,835
kWh
|
$341
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.2511: Insulate bare equipment | $579 | $350 |
$579
5,102
kWh
|
- | - | - | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,321 | $240 |
$1,928
16,984
kWh
|
$393
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,814 | $5,000 | - | - | - | - |
$2,814
-
lb
|
- | - | |
09 | 4.521: Clear and rent existing space | $238,320 | $11,000 | - | - | - | - | - | $220,320 | $18,000 | |
TOTAL RECOMMENDED | $294,861 | $30,840 |
$25,731
226,702
kWh
|
$15,958
-
kW-mo/yr
|
$14,160 |
$(-2,122.0)
-
MMBtu
|
$2,814
-
lb
|
$220,320 | $18,000 | ||
TOTAL IMPLEMENTED | $8,273 | $240 |
$7,880
69,425
kWh
|
$393
-
kW-mo/yr
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs