| Assessment Year | 2003 |
|---|---|
| Principal Product | O-rings |
| NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
| SIC | 3053: Gaskets, Packing, and Sealing Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 744 |
| Plant Area |
86,400
ft2
|
| Annual Production | 3,170,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $233,016 | 2,172,800 |
kWh
|
$0.11 |
| Electricity Demand | $48,638 | 8,205 |
kW-mo/yr
|
$5.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $78,582 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,757 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $44,624 | $76,000 |
$36,973
342,342
kWh
|
$9,025
-
kW-mo/yr
|
$(-1,374.0)
-
MMBtu
|
- | |
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $12,503 | $25,000 |
$9,301
86,118
kWh
|
$3,202
-
kW-mo/yr
|
- | - | |
| 03 | 2.7145: Install skylights | $12,438 | $8,500 |
$8,642
80,025
kWh
|
$3,796
-
kW-mo/yr
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $4,018 | $2,500 |
$365
3,381
kWh
|
$3,653
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,160 | $1,680 |
$935
8,653
kWh
|
$225
-
kW-mo/yr
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $739 | $300 |
$564
5,232
kWh
|
$175
-
kW-mo/yr
|
- | - | |
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,100 | $10,000 | - | - | - |
$3,100
-
lb
|
|
| TOTAL RECOMMENDED | $78,582 | $123,980 |
$56,780
525,751
kWh
|
$20,076
-
kW-mo/yr
|
$(-1,374.0)
-
MMBtu
|
$3,100
-
lb
|
||
| TOTAL IMPLEMENTED | $4,757 | $2,800 |
$929
8,613
kWh
|
$3,828
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs