ITAC Assessment: SD0318
ITAC logo
ITAC Assessment: SD0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product O-rings
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 744
Plant Area 86,400
ft2
Annual Production 3,170,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,016 2,172,800
kWh
Electricity Demand $48,638 8,205
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,757

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $44,624 $76,000 $36,973
342,342
kWh
$9,025
-
kW-mo/yr
$(-1,374.0)
-
MMBtu
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $12,503 $25,000 $9,301
86,118
kWh
$3,202
-
kW-mo/yr
- -
03 2.7145: Install skylights $12,438 $8,500 $8,642
80,025
kWh
$3,796
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $4,018 $2,500 $365
3,381
kWh
$3,653
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,160 $1,680 $935
8,653
kWh
$225
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $739 $300 $564
5,232
kWh
$175
-
kW-mo/yr
- -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,100 $10,000 - - - $3,100
-
lb
TOTAL RECOMMENDED $78,582 $123,980 $56,780
525,751
kWh
$20,076
-
kW-mo/yr
$(-1,374.0)
-
MMBtu
$3,100
-
lb
TOTAL IMPLEMENTED $4,757 $2,800 $929
8,613
kWh
$3,828
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs