ITAC Assessment: SD0316
ITAC logo
ITAC Assessment: SD0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Frozen Fruits/Vegetables
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 44,500
ft2
Annual Production 42,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,142 2,535,524
kWh
Electricity Demand $85,431 7,587
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,583 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,913

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,055 $3,750 $2,780
24,622
kWh
$275
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,922 - $2,362
20,924
kWh
$560
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,991 $300 $1,656
14,682
kWh
$335
-
kW-mo/yr
- - -
04 2.7145: Install skylights $872 $1,000 $521
4,612
kWh
$351
-
kW-mo/yr
- - -
05 3.3128: Utilize other methods to remove contaminants $47,600 $40,000 - - - - $47,600
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $11,188 $10,000 - - - $11,188
-
lb
-
07 3.4111: Use closed cycle process to minimize waste water production $2,955 $9,800 - - $2,955
-
Tgal
- -
TOTAL RECOMMENDED $70,583 $64,850 $7,319
64,840
kWh
$1,521
-
kW-mo/yr
$2,955
-
Tgal
$11,188
-
lb
$47,600
TOTAL IMPLEMENTED $4,913 $300 $4,018
35,606
kWh
$895
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs