ITAC Assessment: SD0312
ITAC logo
ITAC Assessment: SD0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Boat
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 95,000
ft2
Annual Production 3
pieces
Production Hrs. Annual 2,338
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,876 653,400
kWh
Electricity Demand $23,916 2,082
kW-mo/yr
Natural Gas $1,088 158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7134: Use photocell controls $16,275 $11,000 $8,646
91,300
kWh
$7,629
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,368 - $1,473
15,519
kWh
$895
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,675 $400 $1,032
10,899
kWh
$643
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $781 - $781
8,250
kWh
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,500 $10,000 - - $7,500
TOTAL RECOMMENDED $28,599 $21,400 $11,932
125,968
kWh
$9,167
-
kW-mo/yr
$7,500
TOTAL IMPLEMENTED $781 - $781
8,250
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs