Assessment Year | 2002 |
---|---|
Principal Product | Aluminum Extrusion |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
65,000
ft2
|
Annual Production | 17,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $403,156 | 3,830,247 |
kWh
|
$0.11 |
Electricity Fees | $96,089 | - |
|
- |
Natural Gas | $264,738 | 39,377 |
MMBtu
|
$6.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $459,816 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,445 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $374,073 | $1,142,500 |
$299,107
2,285,000
kWh
|
$74,966
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,480 | $14,000 |
$20,281
195,387
kWh
|
$3,199
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,693 | $16,000 |
$5,977
57,580
kWh
|
$4,716
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $9,894 | $3,000 |
$3,503
33,750
kWh
|
$6,391
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,878 | $280 |
$7,817
75,288
kWh
|
$2,061
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,797 | - |
$6,200
59,739
kWh
|
$1,597
-
kW-mo/yr
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $6,916 | $2,000 |
$6,916
66,726
kWh
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,515 | $4,000 |
$2,174
20,947
kWh
|
$341
-
kW-mo/yr
|
- | - | |
09 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,770 | - |
$1,401
1,350
kWh
|
$369
-
kW-mo/yr
|
- | - | |
10 | 3.3131: Use evaporation to concentrate material | $10,000 | $15,000 | - | - |
$10,000
-
lb
|
- | |
11 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,800 | $5,000 | - | - | - | $2,800 | |
TOTAL RECOMMENDED | $459,816 | $1,201,780 |
$353,376
2,795,767
kWh
|
$93,640
-
kW-mo/yr
|
$10,000
-
lb
|
$2,800 | ||
TOTAL IMPLEMENTED | $19,445 | $280 |
$15,418
136,377
kWh
|
$4,027
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs