ITAC Assessment: SD0309
ITAC logo
ITAC Assessment: SD0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Soft Drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 79,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,129,667 9,121,283
kWh
Electricity Fees $155,711 -
Natural Gas $124,192 30,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $33,835 $30,000 - - $33,835
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,073 $600 $5,765
63,004
kWh
$1,308
-
kW-mo/yr
- - - -
03 2.2511: Insulate bare equipment $5,128 $3,024 - - $5,128
-
MMBtu
- - -
04 2.2441: Preheat boiler makeup water with waste process heat $5,120 $20,000 - - $5,120
-
MMBtu
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,945 $4,000 $4,353
47,577
kWh
$592
-
kW-mo/yr
- - - -
06 2.7145: Install skylights $4,178 $9,500 $2,191
23,940
kWh
$1,987
-
kW-mo/yr
- - - -
07 2.2449: Recover heat from exhausted steam, hot air or hot water $2,955 $2,263 - - $2,084
-
MMBtu
$871
-
Tgal
- -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,000 $10,000 - - - - - $8,000
09 3.4111: Use closed cycle process to minimize waste water production $3,820 $14,000 - - - $3,820
-
Tgal
- -
10 4.652: Replace existing equipment with more suitable substitutes $11,200 $2,500 - - - - $11,200 -
TOTAL RECOMMENDED $86,254 $95,887 $12,309
134,521
kWh
$3,887
-
kW-mo/yr
$46,167
-
MMBtu
$4,691
-
Tgal
$11,200 $8,000
TOTAL IMPLEMENTED $29,228 $15,363 $5,765
63,004
kWh
$1,308
-
kW-mo/yr
$2,084
-
MMBtu
$871
-
Tgal
$11,200 $8,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs