Assessment Year | 2002 |
---|---|
Principal Product | Soft Drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
79,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,129,667 | 9,121,283 |
kWh
|
$0.12 |
Electricity Fees | $155,711 | - |
|
- |
Natural Gas | $124,192 | 30,760 |
MMBtu
|
$4.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,254 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,228 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $33,835 | $30,000 | - | - |
$33,835
-
MMBtu
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,073 | $600 |
$5,765
63,004
kWh
|
$1,308
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $5,128 | $3,024 | - | - |
$5,128
-
MMBtu
|
- | - | - | |
04 | 2.2441: Preheat boiler makeup water with waste process heat | $5,120 | $20,000 | - | - |
$5,120
-
MMBtu
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,945 | $4,000 |
$4,353
47,577
kWh
|
$592
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7145: Install skylights | $4,178 | $9,500 |
$2,191
23,940
kWh
|
$1,987
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $2,955 | $2,263 | - | - |
$2,084
-
MMBtu
|
$871
-
Tgal
|
- | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $8,000 | $10,000 | - | - | - | - | - | $8,000 | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $3,820 | $14,000 | - | - | - |
$3,820
-
Tgal
|
- | - | |
10 | 4.652: Replace existing equipment with more suitable substitutes | $11,200 | $2,500 | - | - | - | - | $11,200 | - | |
TOTAL RECOMMENDED | $86,254 | $95,887 |
$12,309
134,521
kWh
|
$3,887
-
kW-mo/yr
|
$46,167
-
MMBtu
|
$4,691
-
Tgal
|
$11,200 | $8,000 | ||
TOTAL IMPLEMENTED | $29,228 | $15,363 |
$5,765
63,004
kWh
|
$1,308
-
kW-mo/yr
|
$2,084
-
MMBtu
|
$871
-
Tgal
|
$11,200 | $8,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs