ITAC Assessment: SD0307
ITAC logo
ITAC Assessment: SD0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Cheese
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 22,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 5,460
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,071 1,265,250
kWh
Electricity Demand $9,137 3,326
kW-mo/yr
Electricity Fees $3,439 -
Natural Gas $51,911 11,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $115,174 $476,400 $106,028
2,031,120
kWh
$9,146
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $6,963 $18,000 - - $6,963
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,517 $2,500 $1,517
3,600
kWh
- - -
04 2.7135: Install occupancy sensors $933 $1,200 $933
11,138
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $785 - $732
8,736
kWh
$53
-
kW-mo/yr
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,134 $5,000 - - - $1,134
-
lb
TOTAL RECOMMENDED $126,506 $503,100 $109,210
2,054,594
kWh
$9,199
-
kW-mo/yr
$6,963
-
MMBtu
$1,134
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs