Assessment Year | 2002 |
---|---|
Principal Product | Cheese |
NAICS |
n/a
|
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $10 M to 50M |
# of Employees | 14 |
Plant Area |
22,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,071 | 1,265,250 |
kWh
|
$0.084 |
Electricity Demand | $9,137 | 3,326 |
kW-mo/yr
|
$2.75 |
Electricity Fees | $3,439 | - |
|
- |
Natural Gas | $51,911 | 11,565 |
MMBtu
|
$4.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,506 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $115,174 | $476,400 |
$106,028
2,031,120
kWh
|
$9,146
-
kW-mo/yr
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $6,963 | $18,000 | - | - |
$6,963
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $1,517 | $2,500 |
$1,517
3,600
kWh
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $933 | $1,200 |
$933
11,138
kWh
|
- | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $785 | - |
$732
8,736
kWh
|
$53
-
kW-mo/yr
|
- | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,134 | $5,000 | - | - | - |
$1,134
-
lb
|
|
TOTAL RECOMMENDED | $126,506 | $503,100 |
$109,210
2,054,594
kWh
|
$9,199
-
kW-mo/yr
|
$6,963
-
MMBtu
|
$1,134
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs