Assessment Year | 2002 |
---|---|
Principal Product | Aerospace teflon parts |
NAICS |
n/a
|
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
32,000
ft2
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $225,221 | 1,839,865 |
kWh
|
$0.12 |
Electricity Demand | $37,882 | 4,518 |
kW-mo/yr
|
$8.38 |
Electricity Fees | $1,811 | - |
|
- |
Natural Gas | $7,096 | 1,364 |
MMBtu
|
$5.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $100,471 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $30,135 | $58,000 |
$22,785
186,150
kWh
|
$7,350
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,968 | $320 |
$5,836
47,683
kWh
|
$1,132
-
kW-mo/yr
|
- | - | |
03 | 2.7212: Install or upgrade insulation on hvac distribution systems | $3,733 | $1,000 |
$3,733
30,496
kWh
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $2,775 | $6,000 |
$1,792
14,640
kWh
|
$983
-
kW-mo/yr
|
- | - | |
05 | 2.2511: Insulate bare equipment | $2,690 | $1,200 |
$2,690
21,980
kWh
|
- | - | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $1,586 | $1,000 |
$1,326
10,841
kWh
|
$260
-
kW-mo/yr
|
- | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,584 | $2,000 | - | - |
$1,584
-
lb
|
- | |
08 | 3.2176: Increase use of automation | $51,000 | $50,000 | - | - | - | $51,000 | |
TOTAL RECOMMENDED | $100,471 | $119,520 |
$38,162
311,790
kWh
|
$9,725
-
kW-mo/yr
|
$1,584
-
lb
|
$51,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs