ITAC Assessment: OR0116
ITAC logo
ITAC Assessment: OR0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CONDENSED SKIM MILK
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area
n/a
Annual Production 46,000,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,136 566,823
kWh
Fuel Oil #2 $130,951 24,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,015

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,056 $776 - $9,056
-
MMBtu
-
02 3.4151: Minimize water usage $1,728 - - - $1,728
03 2.2447: Heat water with exhaust heat $11,470 $4,720 - $11,470
-
MMBtu
-
04 2.2123: Insulate feedwater tank $323 $1,804 - $323
-
MMBtu
-
05 2.3212: Optimize plant power factor $752 - - - $752
06 2.2511: Insulate bare equipment $226 $491 - $226
-
MMBtu
-
07 2.2444: Use hot process fluids to preheat incoming process fluids $2,781 $6,670 - $2,781
-
MMBtu
-
08 2.4133: Use most efficient type of electric motors $118 $305 $118
2,345
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $41 - $79
2,052
kWh
- $(-38.0)
TOTAL RECOMMENDED $26,495 $14,766 $197
4,397
kWh
$23,856
-
MMBtu
$2,442
TOTAL IMPLEMENTED $24,015 $14,766 $197
4,397
kWh
$23,856
-
MMBtu
$(-38.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs