| Assessment Year | 1991 |
|---|---|
| Principal Product | CONDENSED SKIM MILK |
| NAICS |
n/a
|
| SIC | 2023: Dry, Condensed, and Evaporated Dairy Products |
| Sales Range | $1 M to 5M |
| # of Employees | 10 |
| Plant Area |
n/a
|
| Annual Production | 46,000,000
lb
|
| Production Hrs. Annual | 3,640
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $28,136 | 566,823 |
kWh
|
$0.050 |
| Fuel Oil #2 | $130,951 | 24,220 |
MMBtu
|
$5.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,495 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,015 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,056 | $776 | - |
$9,056
-
MMBtu
|
- | |
| 02 | 3.4151: Minimize water usage | $1,728 | - | - | - | $1,728 | |
| 03 | 2.2447: Heat water with exhaust heat | $11,470 | $4,720 | - |
$11,470
-
MMBtu
|
- | |
| 04 | 2.2123: Insulate feedwater tank | $323 | $1,804 | - |
$323
-
MMBtu
|
- | |
| 05 | 2.3212: Optimize plant power factor | $752 | - | - | - | $752 | |
| 06 | 2.2511: Insulate bare equipment | $226 | $491 | - |
$226
-
MMBtu
|
- | |
| 07 | 2.2444: Use hot process fluids to preheat incoming process fluids | $2,781 | $6,670 | - |
$2,781
-
MMBtu
|
- | |
| 08 | 2.4133: Use most efficient type of electric motors | $118 | $305 |
$118
2,345
kWh
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41 | - |
$79
2,052
kWh
|
- | $(-38.0) | |
| TOTAL RECOMMENDED | $26,495 | $14,766 |
$197
4,397
kWh
|
$23,856
-
MMBtu
|
$2,442 | ||
| TOTAL IMPLEMENTED | $24,015 | $14,766 |
$197
4,397
kWh
|
$23,856
-
MMBtu
|
$(-38.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs