ITAC Assessment: SD0293
ITAC logo
ITAC Assessment: SD0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product laminated panels for motor homes/RV's electronic and furniture industrie
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 120,000
ft2
Annual Production 20,000,000
thousand feet
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,204 1,770,957
kWh
Electricity Demand $72,863 8,757
kW-mo/yr
Electricity Fees $1,440 -
Natural Gas $1,534 118
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $182,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $42,804 $52,000 $35,316
318,736
kWh
$7,488
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $4,322 $3,700 $3,565
32,171
kWh
$757
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $5,121 $1,000 $3,199
28,875
kWh
$1,922
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,238 $280 $4,299
38,804
kWh
$939
-
kW-mo/yr
-
05 2.7144: Install spectral reflectors / delamp $2,851 $4,092 $2,124
19,172
kWh
$727
-
kW-mo/yr
-
06 3.2176: Increase use of automation $122,000 $45,000 - - $122,000
07 2.8123: Pay utility bills on time $417 - - - $417
TOTAL RECOMMENDED $182,753 $106,072 $48,503
437,758
kWh
$11,833
-
kW-mo/yr
$122,417
TOTAL IMPLEMENTED $57,485 $56,980 $46,379
418,586
kWh
$11,106
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs