Assessment Year | 2002 |
---|---|
Principal Product | laminated panels for motor homes/RV's electronic and furniture industrie |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
120,000
ft2
|
Annual Production | 20,000,000
thousand feet
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $196,204 | 1,770,957 |
kWh
|
$0.11 |
Electricity Demand | $72,863 | 8,757 |
kW-mo/yr
|
$8.32 |
Electricity Fees | $1,440 | - |
|
- |
Natural Gas | $1,534 | 118 |
MMBtu
|
$13.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $182,753 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,485 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $42,804 | $52,000 |
$35,316
318,736
kWh
|
$7,488
-
kW-mo/yr
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $4,322 | $3,700 |
$3,565
32,171
kWh
|
$757
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $5,121 | $1,000 |
$3,199
28,875
kWh
|
$1,922
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,238 | $280 |
$4,299
38,804
kWh
|
$939
-
kW-mo/yr
|
- | |
05 | 2.7144: Install spectral reflectors / delamp | $2,851 | $4,092 |
$2,124
19,172
kWh
|
$727
-
kW-mo/yr
|
- | |
06 | 3.2176: Increase use of automation | $122,000 | $45,000 | - | - | $122,000 | |
07 | 2.8123: Pay utility bills on time | $417 | - | - | - | $417 | |
TOTAL RECOMMENDED | $182,753 | $106,072 |
$48,503
437,758
kWh
|
$11,833
-
kW-mo/yr
|
$122,417 | ||
TOTAL IMPLEMENTED | $57,485 | $56,980 |
$46,379
418,586
kWh
|
$11,106
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs