ITAC Assessment: SD0290
ITAC logo
ITAC Assessment: SD0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product plastic pipe fittings
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 470,000
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $574,619 6,069,601
kWh
Electricity Demand $154,638 11,997
kW-mo/yr
Electricity Fees $4,308 -
Natural Gas $2,447 246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $235,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,119 $92,500 $8,457
89,301
kWh
$1,662
-
kW-mo/yr
- -
02 2.3132: Recharge batteries on during off-peak demand periods $5,051 - - $5,051
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $13,010 $3,550 $13,010
137,390
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,675 - $1,303
17,712
kWh
$372
-
kW-mo/yr
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,194 - - $7,194
-
kW-mo/yr
- -
06 2.7134: Use photocell controls $4,596 $650 $2,585
27,300
kWh
$2,011
-
kW-mo/yr
- -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,780 $5,000 - - $10,780
-
lb
-
08 3.2176: Increase use of automation $58,512 $41,000 - - - $58,512
09 3.2176: Increase use of automation $124,400 $180,000 - - - $124,400
TOTAL RECOMMENDED $235,337 $322,700 $25,355
271,703
kWh
$16,290
-
kW-mo/yr
$10,780
-
lb
$182,912
TOTAL IMPLEMENTED $79,953 $134,150 $12,345
134,313
kWh
$9,096
-
kW-mo/yr
- $58,512
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs