Assessment Year | 2002 |
---|---|
Principal Product | plastic pipe fittings |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 190 |
Plant Area |
470,000
ft2
|
Annual Production | 11,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $574,619 | 6,069,601 |
kWh
|
$0.095 |
Electricity Demand | $154,638 | 11,997 |
kW-mo/yr
|
$12.89 |
Electricity Fees | $4,308 | - |
|
- |
Natural Gas | $2,447 | 246 |
MMBtu
|
$9.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $235,337 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $79,953 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,119 | $92,500 |
$8,457
89,301
kWh
|
$1,662
-
kW-mo/yr
|
- | - | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $5,051 | - | - |
$5,051
-
kW-mo/yr
|
- | - | |
03 | 2.2511: Insulate bare equipment | $13,010 | $3,550 |
$13,010
137,390
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,675 | - |
$1,303
17,712
kWh
|
$372
-
kW-mo/yr
|
- | - | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,194 | - | - |
$7,194
-
kW-mo/yr
|
- | - | |
06 | 2.7134: Use photocell controls | $4,596 | $650 |
$2,585
27,300
kWh
|
$2,011
-
kW-mo/yr
|
- | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,780 | $5,000 | - | - |
$10,780
-
lb
|
- | |
08 | 3.2176: Increase use of automation | $58,512 | $41,000 | - | - | - | $58,512 | |
09 | 3.2176: Increase use of automation | $124,400 | $180,000 | - | - | - | $124,400 | |
TOTAL RECOMMENDED | $235,337 | $322,700 |
$25,355
271,703
kWh
|
$16,290
-
kW-mo/yr
|
$10,780
-
lb
|
$182,912 | ||
TOTAL IMPLEMENTED | $79,953 | $134,150 |
$12,345
134,313
kWh
|
$9,096
-
kW-mo/yr
|
- | $58,512 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs