ITAC Assessment: SD0289
ITAC logo
ITAC Assessment: SD0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product foam
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range n/a
# of Employees 200
Plant Area 1,200,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,560,041 12,658,370
kWh
Electricity Demand $450,003 33,683
kW-mo/yr
Electricity Fees $7,679 -
Natural Gas $152,369 24,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,644,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,365,840 $2,430,000 $1,045,200
12,000,000
kWh
$320,640
-
kW-mo/yr
- - - -
02 2.7145: Install skylights $57,206 $2,700 $50,954
585,000
kWh
$6,252
-
kW-mo/yr
- - - -
03 2.4239: Eliminate or reduce compressed air usage $27,381 $11,000 $21,930
251,775
kWh
$5,451
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,500 $11,000 $5,331
61,273
kWh
$1,169
-
kW-mo/yr
- - - -
05 2.6218: Turn off equipment when not in use $3,096 $300 $3,096
35,545
kWh
- - - - -
06 2.7135: Install occupancy sensors $1,066 $800 $1,066
12,240
kWh
- - - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $91,045 $65,000 $69,669
799,868
kWh
$21,376
-
kW-mo/yr
- - - -
08 3.5311: Recover and reuse waste material $13,200 $20,000 - - - $13,200
-
lb
- -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,600 $1,500 - - $3,600
-
gal
- - -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $40,040 - - - - - - $40,040
11 3.6192: Use a less expensive method of waste removal $33,600 $1,600 - - - - $33,600 -
12 2.8123: Pay utility bills on time $1,554 - - - - - - $1,554
TOTAL RECOMMENDED $1,644,128 $2,543,900 $1,197,246
13,745,701
kWh
$354,888
-
kW-mo/yr
$3,600
-
gal
$13,200
-
lb
$33,600 $41,594
TOTAL IMPLEMENTED $3,096 $300 $3,096
35,545
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings