Assessment Year | 2002 |
---|---|
Principal Product | foam |
NAICS |
n/a
|
SIC | 3086: Plastics Foam Products |
Sales Range | n/a |
# of Employees | 200 |
Plant Area |
1,200,000
ft2
|
Annual Production | 3,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,560,041 | 12,658,370 |
kWh
|
$0.12 |
Electricity Demand | $450,003 | 33,683 |
kW-mo/yr
|
$13.36 |
Electricity Fees | $7,679 | - |
|
- |
Natural Gas | $152,369 | 24,769 |
MMBtu
|
$6.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,644,128 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,096 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $1,365,840 | $2,430,000 |
$1,045,200
12,000,000
kWh
|
$320,640
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7145: Install skylights | $57,206 | $2,700 |
$50,954
585,000
kWh
|
$6,252
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $27,381 | $11,000 |
$21,930
251,775
kWh
|
$5,451
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,500 | $11,000 |
$5,331
61,273
kWh
|
$1,169
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $3,096 | $300 |
$3,096
35,545
kWh
|
- | - | - | - | - | |
06 | 2.7135: Install occupancy sensors | $1,066 | $800 |
$1,066
12,240
kWh
|
- | - | - | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $91,045 | $65,000 |
$69,669
799,868
kWh
|
$21,376
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.5311: Recover and reuse waste material | $13,200 | $20,000 | - | - | - |
$13,200
-
lb
|
- | - | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,600 | $1,500 | - | - |
$3,600
-
gal
|
- | - | - | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $40,040 | - | - | - | - | - | - | $40,040 | |
11 | 3.6192: Use a less expensive method of waste removal | $33,600 | $1,600 | - | - | - | - | $33,600 | - | |
12 | 2.8123: Pay utility bills on time | $1,554 | - | - | - | - | - | - | $1,554 | |
TOTAL RECOMMENDED | $1,644,128 | $2,543,900 |
$1,197,246
13,745,701
kWh
|
$354,888
-
kW-mo/yr
|
$3,600
-
gal
|
$13,200
-
lb
|
$33,600 | $41,594 | ||
TOTAL IMPLEMENTED | $3,096 | $300 |
$3,096
35,545
kWh
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs