Assessment Year | 2001 |
---|---|
Principal Product | Investment casting |
NAICS |
n/a
|
SIC | 3324: Steel Investment Foundries |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 4,200,000
lb
|
Production Hrs. Annual | 4,675
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $337,934 | 5,364,409 |
kWh
|
$0.063 |
Electricity Demand | $112,916 | 16,722 |
kW-mo/yr
|
$6.75 |
Electricity Fees | $5,028 | - |
|
- |
Natural Gas | $129,249 | 17,585 |
MMBtu
|
$7.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $221,151 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,141 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2424: Use heat in flue gases to preheat products or materials | $38,808 | $51,000 |
$38,808
616,000
kWh
|
- | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,141 | $200 |
$4,032
63,997
kWh
|
$1,109
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7145: Install skylights | $3,574 | $11,000 |
$2,008
31,878
kWh
|
$1,566
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $794 | - |
$531
8,428
kWh
|
$263
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $6,537 | $5,000 |
$4,777
75,831
kWh
|
$1,760
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,928 | $18,000 |
$10,924
173,394
kWh
|
$3,004
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa | $16,954 | $30,000 |
$16,954
269,105
kWh
|
- | - | - | - | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,540 | $15,000 | - | - | - | - | $(-300.0) | $4,840 | |
09 | 3.5222: Use sand for other purposes (eg construction fill, cover for municipal landfills) | $41,000 | - | - | - | - | - | - | $41,000 | |
10 | 3.5311: Recover and reuse waste material | $34,600 | $75,000 | - | - |
$63,000
-
lb
|
$(-26,400.0) | $(-2,000.0) | - | |
11 | 4.652: Replace existing equipment with more suitable substitutes | $42,075 | $50,000 | - | - | - | $42,075 | - | - | |
12 | 4.211: Consider use / purchase of bulk materials where possible | $13,200 | $35,000 | - | - | - | $13,200 | - | - | |
TOTAL RECOMMENDED | $221,151 | $290,200 |
$78,034
1,238,633
kWh
|
$7,702
-
kW-mo/yr
|
$63,000
-
lb
|
$28,875 | $(-2,300.0) | $45,840 | ||
TOTAL IMPLEMENTED | $5,141 | $200 |
$4,032
63,997
kWh
|
$1,109
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs