Assessment Year | 2001 |
---|---|
Principal Product | Die cast fan housings |
NAICS |
n/a
|
SIC | 3364: Nonferrous Die-Castings, Except Aluminum |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
70,000
ft2
|
Annual Production | 2,900,000
lb
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $220,508 | 2,787,538 |
kWh
|
$0.079 |
Electricity Demand | $89,409 | 8,327 |
kW-mo/yr
|
$10.74 |
Electricity Fees | $16,145 | - |
|
- |
Natural Gas | $138,757 | 27,263 |
MMBtu
|
$5.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $510,298 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,061 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,030 | $1,720 |
$16,538
209,119
kWh
|
$4,492
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $40,552 | $100,000 |
$30,000
379,271
kWh
|
$15,552
-
kW-mo/yr
|
- | - | - | - | $(-5,000.0) | - | |
03 | 2.2437: Recover waste heat from equipment | $11,030 | $5,000 | - | - |
$11,030
-
MMBtu
|
- | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $930 | $3,000 |
$779
9,847
kWh
|
$151
-
kW-mo/yr
|
- | - | - | - | - | - | |
05 | 2.7145: Install skylights | $12,773 | $26,500 |
$5,416
68,477
kWh
|
$7,357
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,765 | $4,674 |
$1,089
13,766
kWh
|
$676
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 2.2511: Insulate bare equipment | $3,648 | $7,000 | - | - |
$3,648
-
MMBtu
|
- | - | - | - | - | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,680 | $6,000 | - | - | - | - | - | - | - | $3,680 | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,947 | $5,400 | - | - | - | - | - | - | $100 | $1,847 | |
10 | 3.6112: Use filter and drying oven to reduce sludge volume | $12,060 | $20,000 | - | - | - | - | - | - | $(-5,000.0) | $17,060 | |
11 | 3.4131: Minimize contamination of water before treatment | $2,383 | $2,000 | - | - | - | - |
$2,383
-
gal
|
- | - | - | |
12 | 3.4151: Minimize water usage | $35,500 | $15,000 | - | - | - |
$35,500
-
Tgal
|
- | - | - | - | |
13 | 4.445: Install equipment to move product | $337,800 | $640,000 | - | - | - | - | - | $352,800 | $(-15,000.0) | - | |
14 | 4.445: Install equipment to move product | $25,200 | $25,000 | - | - | - | - | - | $25,200 | - | - | |
TOTAL RECOMMENDED | $510,298 | $861,294 |
$53,822
680,480
kWh
|
$28,228
-
kW-mo/yr
|
$14,678
-
MMBtu
|
$35,500
-
Tgal
|
$2,383
-
gal
|
$378,000 | $(-24,900.0) | $22,587 | ||
TOTAL IMPLEMENTED | $27,061 | $10,720 |
$16,538
209,119
kWh
|
$4,492
-
kW-mo/yr
|
$3,648
-
MMBtu
|
- |
$2,383
-
gal
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs