ITAC Assessment: SD0271
ITAC logo
ITAC Assessment: SD0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Ice cream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 200,000
ft2
Annual Production 12,000
Tgal
Production Hrs. Annual 6,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,411,825 18,377,000
kWh
Electricity Demand $423,245 43,873
kW-mo/yr
Electricity Fees $9,156 -
Natural Gas $169,449 27,251
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $678,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $6,508 - - $6,508
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,184 $360 $4,863
91,239
kWh
$1,321
-
kW-mo/yr
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,818 $18,000 $9,526
178,727
kWh
$3,292
-
kW-mo/yr
- - - -
04 2.7145: Install skylights $3,038 $8,000 $1,275
23,925
kWh
$1,763
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,502 $3,200 $1,281
24,033
kWh
$221
-
kW-mo/yr
- - - -
06 2.7124: Make a practice of turning off lights when not needed $1,000 $1,340 $835
15,664
kWh
$165
-
kW-mo/yr
- - - -
07 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $256,765 $1,482,000 $425,654
7,986,000
kWh
$147,088
-
kW-mo/yr
$(-671,805.0)
-
MMBtu
- - $355,828
08 4.445: Install equipment to move product $79,200 $300 - - - $79,200 - -
09 4.441: Install automatic packing equipment $154,900 $125,000 - - - $158,400 $(-3,500.0) -
10 4.445: Install equipment to move product $79,200 $6,600 - - - $79,200 - -
11 4.445: Install equipment to move product $76,200 $35,000 - - - $79,200 $(-3,000.0) -
12 4.821: Pay bills on time to avoid late fees $925 - - - - - $925 -
TOTAL RECOMMENDED $678,240 $1,679,800 $443,434
8,319,588
kWh
$160,358
-
kW-mo/yr
$(-671,805.0)
-
MMBtu
$396,000 $(-5,575.0) $355,828
TOTAL IMPLEMENTED $85,384 $660 $4,863
91,239
kWh
$1,321
-
kW-mo/yr
- $79,200 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs