Assessment Year | 2001 |
---|---|
Principal Product | Ice cream |
NAICS |
n/a
|
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
200,000
ft2
|
Annual Production | 12,000
Tgal
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,411,825 | 18,377,000 |
kWh
|
$0.077 |
Electricity Demand | $423,245 | 43,873 |
kW-mo/yr
|
$9.65 |
Electricity Fees | $9,156 | - |
|
- |
Natural Gas | $169,449 | 27,251 |
MMBtu
|
$6.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $678,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,384 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $6,508 | - | - |
$6,508
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,184 | $360 |
$4,863
91,239
kWh
|
$1,321
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,818 | $18,000 |
$9,526
178,727
kWh
|
$3,292
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7145: Install skylights | $3,038 | $8,000 |
$1,275
23,925
kWh
|
$1,763
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,502 | $3,200 |
$1,281
24,033
kWh
|
$221
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $1,000 | $1,340 |
$835
15,664
kWh
|
$165
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $256,765 | $1,482,000 |
$425,654
7,986,000
kWh
|
$147,088
-
kW-mo/yr
|
$(-671,805.0)
-
MMBtu
|
- | - | $355,828 | |
08 | 4.445: Install equipment to move product | $79,200 | $300 | - | - | - | $79,200 | - | - | |
09 | 4.441: Install automatic packing equipment | $154,900 | $125,000 | - | - | - | $158,400 | $(-3,500.0) | - | |
10 | 4.445: Install equipment to move product | $79,200 | $6,600 | - | - | - | $79,200 | - | - | |
11 | 4.445: Install equipment to move product | $76,200 | $35,000 | - | - | - | $79,200 | $(-3,000.0) | - | |
12 | 4.821: Pay bills on time to avoid late fees | $925 | - | - | - | - | - | $925 | - | |
TOTAL RECOMMENDED | $678,240 | $1,679,800 |
$443,434
8,319,588
kWh
|
$160,358
-
kW-mo/yr
|
$(-671,805.0)
-
MMBtu
|
$396,000 | $(-5,575.0) | $355,828 | ||
TOTAL IMPLEMENTED | $85,384 | $660 |
$4,863
91,239
kWh
|
$1,321
-
kW-mo/yr
|
- | $79,200 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs