Assessment Year | 2001 |
---|---|
Principal Product | rubber o-rings |
NAICS |
n/a
|
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 650 |
Plant Area |
200,000
ft2
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $783,886 | 15,392,861 |
kWh
|
$0.051 |
Electricity Demand | $326,400 | 32,021 |
kW-mo/yr
|
$10.19 |
Electricity Fees | $4,308 | - |
|
- |
Natural Gas | $12,940 | 4,702 |
MMBtu
|
$2.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,546,786 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $412,259 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $182,520 | $35,000 |
$66,874
1,311,250
kWh
|
$29,246
-
kW-mo/yr
|
- | - | - | $129,600 | $(-43,200.0) | - | - | |
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $21,642 | $15,000 |
$18,564
364,007
kWh
|
$6,078
-
kW-mo/yr
|
- | - | - | - | $(-3,000.0) | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,189 | $800 |
$21,898
429,376
kWh
|
$7,291
-
kW-mo/yr
|
- | - | - | $(-6,000.0) | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $63,100 | $90,000 |
$47,489
933,120
kWh
|
$26,412
-
kW-mo/yr
|
$(-10,801.0)
-
MMBtu
|
- | - | - | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,077 | $36,000 |
$20,311
398,260
kWh
|
$6,766
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $51,823 | $103,000 |
$38,871
762,174
kWh
|
$12,952
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
07 | 2.7145: Install skylights | $7,878 | $12,500 |
$3,378
66,240
kWh
|
$4,500
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
08 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $983,363 | $3,037,200 |
$788,746
15,465,600
kWh
|
$262,657
-
kW-mo/yr
|
$(-738,838.0)
-
MMBtu
|
- | - | - | - | - | $670,798 | |
09 | 3.5311: Recover and reuse waste material | $32,522 | $5,000 | - | - | - | - |
$10,764
-
lb
|
$(-28,800.0) | $51,558 |
$(-1,000.0)
-
Tgal
|
- | |
10 | 3.4131: Minimize contamination of water before treatment | $3,170 | $1,500 | - | - | - |
$3,170
-
gal
|
- | - | - | - | - | |
11 | 3.8132: Use less toxic and volatile solvent substitutes | $648 | - | - | - | - |
$648
-
gal
|
- | - | - | - | - | |
12 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $25,910 | $15,000 | - | - | - | - | - | - | $(-500.0) | - | $26,410 | |
13 | 3.5218: Reuse / recycle/ sell rubber products | $35,880 | - | - | - | - | - | - | - | - | - | $35,880 | |
14 | 4.821: Pay bills on time to avoid late fees | $1,393 | - | - | - | - | - | - | - | - | - | $1,393 | |
15 | 4.424: Improve space comfort conditioning | $65,375 | $30,000 | - | - | - | - | - | - | $65,375 | - | - | |
16 | 4.211: Consider use / purchase of bulk materials where possible | $21,296 | $30,000 | - | - | - | - | - | $8,352 | $12,944 | - | - | |
TOTAL RECOMMENDED | $1,546,786 | $3,411,000 |
$1,006,131
19,730,027
kWh
|
$355,902
-
kW-mo/yr
|
$(-749,639.0)
-
MMBtu
|
$3,818
-
gal
|
$10,764
-
lb
|
$103,152 | $83,177 |
$(-1,000.0)
-
Tgal
|
$734,481 | ||
TOTAL IMPLEMENTED | $412,259 | $223,800 |
$169,896
3,331,307
kWh
|
$66,833
-
kW-mo/yr
|
- |
$3,818
-
gal
|
$10,764
-
lb
|
$94,800 | $4,858 |
$(-1,000.0)
-
Tgal
|
$62,290 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs