ITAC Assessment: SD0266
ITAC logo
ITAC Assessment: SD0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product air filters
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 100,000
ft2
Annual Production 65,000,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,435 1,617,750
kWh
Electricity Demand $41,811 4,085
kW-mo/yr
Electricity Fees $1,456 -
Natural Gas $9,480 1,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $232,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,560 $5,000 $1,528
14,688
kWh
$1,475
-
kW-mo/yr
$(-443.0)
-
MMBtu
-
02 2.7145: Install skylights $8,646 $16,500 $4,399
42,301
kWh
$4,247
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,892 $210 $1,487
14,294
kWh
$405
-
kW-mo/yr
- -
04 2.7224: Reduce space conditioning during non-working hours $1,776 $1,500 $1,776
12,946
kWh
- - -
05 2.6218: Turn off equipment when not in use $517 $100 $517
4,975
kWh
- - -
06 4.514: Re-arrange equipment layout to reduce handling costs $158,100 $114,362 - - - $158,100
07 4.445: Install equipment to move product $52,020 $10,000 - - - $52,020
08 4.441: Install automatic packing equipment $6,772 $3,400 - - - $6,772
TOTAL RECOMMENDED $232,283 $151,072 $9,707
89,204
kWh
$6,127
-
kW-mo/yr
$(-443.0)
-
MMBtu
$216,892
TOTAL IMPLEMENTED $6,772 $3,400 - - - $6,772
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs