| Assessment Year | 2001 |
|---|---|
| Principal Product | air filters |
| NAICS |
n/a
|
| SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
100,000
ft2
|
| Annual Production | 65,000,000
pieces
|
| Production Hrs. Annual | 4,335
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $168,435 | 1,617,750 |
kWh
|
$0.10 |
| Electricity Demand | $41,811 | 4,085 |
kW-mo/yr
|
$10.24 |
| Electricity Fees | $1,456 | - |
|
- |
| Natural Gas | $9,480 | 1,271 |
MMBtu
|
$7.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $232,283 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,772 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,560 | $5,000 |
$1,528
14,688
kWh
|
$1,475
-
kW-mo/yr
|
$(-443.0)
-
MMBtu
|
- | |
| 02 | 2.7145: Install skylights | $8,646 | $16,500 |
$4,399
42,301
kWh
|
$4,247
-
kW-mo/yr
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,892 | $210 |
$1,487
14,294
kWh
|
$405
-
kW-mo/yr
|
- | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $1,776 | $1,500 |
$1,776
12,946
kWh
|
- | - | - | |
| 05 | 2.6218: Turn off equipment when not in use | $517 | $100 |
$517
4,975
kWh
|
- | - | - | |
| 06 | 4.514: Re-arrange equipment layout to reduce handling costs | $158,100 | $114,362 | - | - | - | $158,100 | |
| 07 | 4.445: Install equipment to move product | $52,020 | $10,000 | - | - | - | $52,020 | |
| 08 | 4.441: Install automatic packing equipment | $6,772 | $3,400 | - | - | - | $6,772 | |
| TOTAL RECOMMENDED | $232,283 | $151,072 |
$9,707
89,204
kWh
|
$6,127
-
kW-mo/yr
|
$(-443.0)
-
MMBtu
|
$216,892 | ||
| TOTAL IMPLEMENTED | $6,772 | $3,400 | - | - | - | $6,772 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs