ITAC Assessment: SD0264
ITAC logo
ITAC Assessment: SD0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product custom plastic injected parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 25,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,227 811,560
kWh
Electricity Demand $25,971 2,971
kW-mo/yr
Electricity Fees $720 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,141 $61,000 $21,855
284,206
kWh
$6,286
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $26,759 $27,900 $28,802
374,544
kWh
$6,903
-
kW-mo/yr
$(-8,946.0)
-
MMBtu
- -
03 2.6218: Turn off equipment when not in use $2,117 $735 $2,117
27,523
kWh
- - - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,654 $7,900 - - - $3,654 -
05 4.651: Install back-up equipment $1,812 $5,500 - - - - $1,812
TOTAL RECOMMENDED $62,483 $103,035 $52,774
686,273
kWh
$13,189
-
kW-mo/yr
$(-8,946.0)
-
MMBtu
$3,654 $1,812
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs