ITAC Assessment: SD0248
ITAC logo
ITAC Assessment: SD0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product paper plates
NAICS
n/a
SIC 2656: Sanitary Food Containers, Except Folding
Sales Range $10
M
to 50
M
# of Employees 163
Plant Area 160,000
ft2
Annual Production 2,000,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,608 3,807,151
kWh
Electricity Demand $138,599 11,168
kW-mo/yr
Electricity Fees $6,066 -
Natural Gas $17,331 2,745
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $31,001 $40,000 $14,918
288,101
kWh
$16,083
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,837 $14,800 $6,837
131,887
kWh
- -
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $4,532 $7,536 $1,554
29,894
kWh
$2,978
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $3,585 - $2,474
47,773
kWh
$1,111
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,887 $4,950 $1,887
36,342
kWh
- -
06 3.3131: Use evaporation to concentrate material $5,300 $12,500 - - $5,300
07 4.131: Modify process to reduce material use/cost $11,600 $1,000 - - $11,600
08 4.131: Modify process to reduce material use/cost $743 $800 - - $743
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,397 $8,500 - - $2,397
10 4.445: Install equipment to move product $70,500 $120,000 - - $70,500
11 4.444: Install system to collect scrap $13,426 $11,836 - - $13,426
TOTAL RECOMMENDED $151,808 $221,922 $27,670
533,997
kWh
$20,172
-
kW-mo/yr
$103,966
TOTAL IMPLEMENTED $44,264 $48,622 $12,752
245,896
kWh
$4,089
-
kW-mo/yr
$27,423
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs