Assessment Year | 2000 |
---|---|
Principal Product | paper plates |
NAICS |
n/a
|
SIC | 2656: Sanitary Food Containers, Except Folding |
Sales Range | $10 M to 50M |
# of Employees | 163 |
Plant Area |
160,000
ft2
|
Annual Production | 2,000,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,608 | 3,807,151 |
kWh
|
$0.052 |
Electricity Demand | $138,599 | 11,168 |
kW-mo/yr
|
$12.41 |
Electricity Fees | $6,066 | - |
|
- |
Natural Gas | $17,331 | 2,745 |
MMBtu
|
$6.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $151,808 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $31,001 | $40,000 |
$14,918
288,101
kWh
|
$16,083
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,837 | $14,800 |
$6,837
131,887
kWh
|
- | - | |
03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $4,532 | $7,536 |
$1,554
29,894
kWh
|
$2,978
-
kW-mo/yr
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,585 | - |
$2,474
47,773
kWh
|
$1,111
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,887 | $4,950 |
$1,887
36,342
kWh
|
- | - | |
06 | 3.3131: Use evaporation to concentrate material | $5,300 | $12,500 | - | - | $5,300 | |
07 | 4.131: Modify process to reduce material use/cost | $11,600 | $1,000 | - | - | $11,600 | |
08 | 4.131: Modify process to reduce material use/cost | $743 | $800 | - | - | $743 | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,397 | $8,500 | - | - | $2,397 | |
10 | 4.445: Install equipment to move product | $70,500 | $120,000 | - | - | $70,500 | |
11 | 4.444: Install system to collect scrap | $13,426 | $11,836 | - | - | $13,426 | |
TOTAL RECOMMENDED | $151,808 | $221,922 |
$27,670
533,997
kWh
|
$20,172
-
kW-mo/yr
|
$103,966 | ||
TOTAL IMPLEMENTED | $44,264 | $48,622 |
$12,752
245,896
kWh
|
$4,089
-
kW-mo/yr
|
$27,423 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs