ITAC Assessment: MA0670
ITAC logo
ITAC Assessment: MA0670
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Woven Narrow FAbrics
NAICS 313220: Narrow Fabric Mills and Schiffli Machine Embroidery
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 250,000
ft2
Annual Production 2,700,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,847 1,168,942
kWh
Electricity Demand $20,782 6,810
kW-mo/yr
Electricity Fees $815 -
Natural Gas $312,566 29,991
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $11,262 $5,845 - - $11,262
-
MMBtu
02 2.3212: Optimize plant power factor $3,931 $7,260 - $3,931
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,994 $1,800 $2,994
24,786
kWh
- -
04 2.2212: Use minimum safe oven ventilation $2,775 $6,150 - - $2,775
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $523 $1,000 $523
4,332
kWh
- -
TOTAL RECOMMENDED $21,485 $22,055 $3,517
29,118
kWh
$3,931
-
kW-mo/yr
$14,037
-
MMBtu
TOTAL IMPLEMENTED $18,187 $14,905 $2,994
24,786
kWh
$3,931
-
kW-mo/yr
$11,262
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs