ITAC Assessment: SD0247
ITAC logo
ITAC Assessment: SD0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product slot machine cases
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 65,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,352 924,385
kWh
Electricity Demand $42,471 3,559
kW-mo/yr
Electricity Fees $1,044 -
Natural Gas $26,510 5,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2425: Use flue gases to heat process or service water $11,396 $8,250 - - $11,396
-
MMBtu
-
02 2.4226: Use / purchase optimum sized compressor $6,905 $3,000 $3,701
65,358
kWh
$3,204
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,007 - $2,472
43,669
kWh
$535
-
kW-mo/yr
- -
04 2.2612: Use cooling tower water instead of refrigeration $5,628 $3,000 $4,060
71,805
kWh
$1,568
-
kW-mo/yr
- -
05 2.7224: Reduce space conditioning during non-working hours $1,279 $1,800 $1,279
22,567
kWh
- - -
06 2.2511: Insulate bare equipment $570 $1,030 - - $570
-
MMBtu
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,440 $12,500 - - - $3,440
08 3.5316: Contract a wood pallet recycling company $6,916 - - - - $6,916
09 4.424: Improve space comfort conditioning $32,000 $10,380 - - - $32,000
TOTAL RECOMMENDED $71,141 $39,960 $11,512
203,399
kWh
$5,307
-
kW-mo/yr
$11,966
-
MMBtu
$42,356
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs