ITAC Assessment: SD0246
ITAC logo
ITAC Assessment: SD0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Rubber products
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 60,000
ft2
Annual Production 12,000,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,405 2,461,606
kWh
Electricity Demand $121,241 7,304
kW-mo/yr
Electricity Fees $1,411 -
Natural Gas $5,401 767
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $380,807 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $256,012

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $23,493 $27,000 $1,751
29,601
kWh
$2,158
-
kW-mo/yr
- - $19,584 -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,870 $14,000 n/a $5,416
91,735
kWh
$9,960
-
kW-mo/yr
$(-2,506.0)
-
MMBtu
- - -
03 2.2612: Use cooling tower water instead of refrigeration $3,276 $3,000 $1,417
24,033
kWh
$1,859
-
kW-mo/yr
- - - -
04 3.5218: Reuse / recycle/ sell rubber products $5,400 - - - - $5,400
-
lb
- -
05 3.8132: Use less toxic and volatile solvent substitutes $336 - - - - - - $336
06 4.111: Add equipment/ operators to reduce production bottleneck $220,320 $13,000 - - - - $220,320 -
07 4.111: Add equipment/ operators to reduce production bottleneck $58,552 $13,000 n/a - - - - $58,552 -
08 4.111: Add equipment/ operators to reduce production bottleneck $32,080 $20,000 - - - - $32,080 -
09 4.112: Replace old machine with new automatic multi-station tool $24,480 $15,000 - - - - $24,480 -
TOTAL RECOMMENDED $380,807 $105,000 $8,584
145,369
kWh
$13,977
-
kW-mo/yr
$(-2,506.0)
-
MMBtu
$5,400
-
lb
$355,016 $336
TOTAL IMPLEMENTED $256,012 $36,000 $1,417
24,033
kWh
$1,859
-
kW-mo/yr
- - $252,400 $336
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs