Assessment Year | 2000 |
---|---|
Principal Product | Rubber products |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
60,000
ft2
|
Annual Production | 12,000,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $145,405 | 2,461,606 |
kWh
|
$0.059 |
Electricity Demand | $121,241 | 7,304 |
kW-mo/yr
|
$16.60 |
Electricity Fees | $1,411 | - |
|
- |
Natural Gas | $5,401 | 767 |
MMBtu
|
$7.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $380,807 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $256,012 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $23,493 | $27,000 |
$1,751
29,601
kWh
|
$2,158
-
kW-mo/yr
|
- | - | $19,584 | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,870 | $14,000 | n/a |
$5,416
91,735
kWh
|
$9,960
-
kW-mo/yr
|
$(-2,506.0)
-
MMBtu
|
- | - | - |
03 | 2.2612: Use cooling tower water instead of refrigeration | $3,276 | $3,000 |
$1,417
24,033
kWh
|
$1,859
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.5218: Reuse / recycle/ sell rubber products | $5,400 | - | - | - | - |
$5,400
-
lb
|
- | - | |
05 | 3.8132: Use less toxic and volatile solvent substitutes | $336 | - | - | - | - | - | - | $336 | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $220,320 | $13,000 | - | - | - | - | $220,320 | - | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $58,552 | $13,000 | n/a | - | - | - | - | $58,552 | - |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $32,080 | $20,000 | - | - | - | - | $32,080 | - | |
09 | 4.112: Replace old machine with new automatic multi-station tool | $24,480 | $15,000 | - | - | - | - | $24,480 | - | |
TOTAL RECOMMENDED | $380,807 | $105,000 |
$8,584
145,369
kWh
|
$13,977
-
kW-mo/yr
|
$(-2,506.0)
-
MMBtu
|
$5,400
-
lb
|
$355,016 | $336 | ||
TOTAL IMPLEMENTED | $256,012 | $36,000 |
$1,417
24,033
kWh
|
$1,859
-
kW-mo/yr
|
- | - | $252,400 | $336 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs