Assessment Year | 2000 |
---|---|
Principal Product | metal plating |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
11,100
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,442 | 617,819 |
kWh
|
$0.056 |
Electricity Demand | $38,197 | 6,762 |
kW-mo/yr
|
$5.65 |
Electricity Fees | $600 | - |
|
- |
Natural Gas | $8,192 | 1,414 |
MMBtu
|
$5.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,702 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,302 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,319 | $14,000 |
$13,199
236,518
kWh
|
$7,973
-
kW-mo/yr
|
$(-5,853.0)
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $7,454 | $5,833 |
$3,832
68,581
kWh
|
$2,352
-
kW-mo/yr
|
$1,270
-
MMBtu
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,787 | $2,500 |
$1,883
33,705
kWh
|
$5,858
-
kW-mo/yr
|
$(-954.0)
-
MMBtu
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,523 | $4,000 |
$1,205
21,688
kWh
|
$2,929
-
kW-mo/yr
|
$(-611.0)
-
MMBtu
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $2,081 | $3,000 |
$2,081
37,222
kWh
|
- | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $905 | $900 |
$397
7,034
kWh
|
$610
-
kW-mo/yr
|
$(-102.0)
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $515 | - |
$235
4,103
kWh
|
$280
-
kW-mo/yr
|
- | - | |
08 | 4.651: Install back-up equipment | $6,118 | $7,000 | - | - | - | $6,118 | |
TOTAL RECOMMENDED | $42,702 | $37,233 |
$22,832
408,851
kWh
|
$20,002
-
kW-mo/yr
|
$(-6,250.0)
-
MMBtu
|
$6,118 | ||
TOTAL IMPLEMENTED | $7,302 | $2,500 |
$2,118
37,808
kWh
|
$6,138
-
kW-mo/yr
|
$(-954.0)
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs