ITAC Assessment: SD0244
ITAC logo
ITAC Assessment: SD0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product instant shelters
NAICS
n/a
SIC 2394: Canvas and Related Products
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 114,000
ft2
Annual Production 380,000
pieces
Production Hrs. Annual 2,717
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,443 607,268
kWh
Electricity Fees $168 -
Natural Gas $3,894 633
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $212,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $137,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,493 $9,500 $5,493
48,652
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,164 $8,784 $4,164
36,928
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $1,481 $600 $1,481
13,189
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $977 - $977
8,792
kWh
- -
05 4.445: Install equipment to move product $136,408 $57,000 - $136,408 -
06 4.515: Install shelves / racks to utilize unused space $61,500 $103,000 - - $61,500
07 4.632: Change operating conditions $2,333 - - - $2,333
TOTAL RECOMMENDED $212,356 $178,884 $12,115
107,561
kWh
$136,408 $63,833
TOTAL IMPLEMENTED $137,385 $57,000 $977
8,792
kWh
$136,408 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs