ITAC Assessment: SD0240
ITAC logo
ITAC Assessment: SD0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 170,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $514,895 22,228,019
kWh
Electricity Demand $398,845 40,379
kW-mo/yr
Electricity Fees $5,760 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $122,463

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $114,651 $214,102 $72,098
3,135,405
kWh
$42,553
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,067 $2,600 $826
35,756
kWh
$241
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $193 $714 $122
5,275
kWh
$71
-
kW-mo/yr
-
04 4.111: Add equipment/ operators to reduce production bottleneck $52,416 $31,000 - - $52,416
05 4.323: Optimize lot sizes to reduce inventory carrying costs $6,552 $6,000 - - $6,552
TOTAL RECOMMENDED $174,879 $254,416 $73,046
3,176,436
kWh
$42,865
-
kW-mo/yr
$58,968
TOTAL IMPLEMENTED $122,463 $223,416 $73,046
3,176,436
kWh
$42,865
-
kW-mo/yr
$6,552
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs