Assessment Year | 2000 |
---|---|
Principal Product | Plastic containers |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
170,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $514,895 | 22,228,019 |
kWh
|
$0.023 |
Electricity Demand | $398,845 | 40,379 |
kW-mo/yr
|
$9.88 |
Electricity Fees | $5,760 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $174,879 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $122,463 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $114,651 | $214,102 |
$72,098
3,135,405
kWh
|
$42,553
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,067 | $2,600 |
$826
35,756
kWh
|
$241
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $193 | $714 |
$122
5,275
kWh
|
$71
-
kW-mo/yr
|
- | |
04 | 4.111: Add equipment/ operators to reduce production bottleneck | $52,416 | $31,000 | - | - | $52,416 | |
05 | 4.323: Optimize lot sizes to reduce inventory carrying costs | $6,552 | $6,000 | - | - | $6,552 | |
TOTAL RECOMMENDED | $174,879 | $254,416 |
$73,046
3,176,436
kWh
|
$42,865
-
kW-mo/yr
|
$58,968 | ||
TOTAL IMPLEMENTED | $122,463 | $223,416 |
$73,046
3,176,436
kWh
|
$42,865
-
kW-mo/yr
|
$6,552 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs