| Assessment Year | 1999 |
|---|---|
| Principal Product | Medical devices |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
82,000
ft2
|
| Annual Production | 643
Tgal
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $330,409 | 6,316,237 |
kWh
|
$0.052 |
| Electricity Demand | $110,403 | 11,750 |
kW-mo/yr
|
$9.40 |
| Electricity Fees | $4,308 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $119,756 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,313 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7144: Install spectral reflectors / delamp | $8,010 | $11,160 |
$5,970
114,302
kWh
|
$2,040
-
kW-mo/yr
|
- | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,708 | $21,250 |
$6,285
120,164
kWh
|
$1,423
-
kW-mo/yr
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,337 | $2,500 |
$2,076
39,859
kWh
|
$261
-
kW-mo/yr
|
- | - | |
| 04 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $6,905 | $7,400 |
$3,365
64,478
kWh
|
$3,540
-
kW-mo/yr
|
- | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $4,487 | $240 |
$3,585
68,581
kWh
|
$902
-
kW-mo/yr
|
- | - | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,920 | $8,500 | - | - |
$3,920
-
lb
|
- | |
| 07 | 4.651: Install back-up equipment | $1,595 | $7,000 | - | - | - | $1,595 | |
| 08 | 4.423: Move product using mechanical means | $63,374 | $33,460 | - | - | - | $63,374 | |
| 09 | 4.514: Re-arrange equipment layout to reduce handling costs | $21,420 | $1,416 | - | - | - | $21,420 | |
| TOTAL RECOMMENDED | $119,756 | $92,926 |
$21,281
407,384
kWh
|
$8,166
-
kW-mo/yr
|
$3,920
-
lb
|
$86,389 | ||
| TOTAL IMPLEMENTED | $17,313 | $39,410 |
$12,255
234,466
kWh
|
$3,463
-
kW-mo/yr
|
- | $1,595 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs