ITAC Assessment: SD0232
ITAC logo
ITAC Assessment: SD0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Medical devices
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 82,000
ft2
Annual Production 643
Tgal
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $330,409 6,316,237
kWh
Electricity Demand $110,403 11,750
kW-mo/yr
Electricity Fees $4,308 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,756 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,313

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7144: Install spectral reflectors / delamp $8,010 $11,160 $5,970
114,302
kWh
$2,040
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,708 $21,250 $6,285
120,164
kWh
$1,423
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,337 $2,500 $2,076
39,859
kWh
$261
-
kW-mo/yr
- -
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $6,905 $7,400 $3,365
64,478
kWh
$3,540
-
kW-mo/yr
- -
05 2.7111: Reduce illumination to minimum necessary levels $4,487 $240 $3,585
68,581
kWh
$902
-
kW-mo/yr
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,920 $8,500 - - $3,920
-
lb
-
07 4.651: Install back-up equipment $1,595 $7,000 - - - $1,595
08 4.423: Move product using mechanical means $63,374 $33,460 - - - $63,374
09 4.514: Re-arrange equipment layout to reduce handling costs $21,420 $1,416 - - - $21,420
TOTAL RECOMMENDED $119,756 $92,926 $21,281
407,384
kWh
$8,166
-
kW-mo/yr
$3,920
-
lb
$86,389
TOTAL IMPLEMENTED $17,313 $39,410 $12,255
234,466
kWh
$3,463
-
kW-mo/yr
- $1,595
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs