Assessment Year | 1999 |
---|---|
Principal Product | coated steel |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 155 |
Plant Area |
270,000
ft2
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,334,868 | 28,604,045 |
kWh
|
$0.047 |
Electricity Demand | $671,952 | 69,693 |
kW-mo/yr
|
$9.64 |
Natural Gas | $1,141,365 | 423,018 |
MMBtu
|
$2.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,513,159 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $113,970 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,090 | $4,048 |
$2,629
58,324
kWh
|
$461
-
kW-mo/yr
|
- | - | - | |
02 | 2.7144: Install spectral reflectors / delamp | $2,483 | $6,030 |
$1,360
29,015
kWh
|
$1,123
-
kW-mo/yr
|
- | - | - | |
03 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $257,414 | $480,000 |
$193,096
3,505,862
kWh
|
$64,318
-
kW-mo/yr
|
- | - | - | |
04 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $1,099,432 | $1,975,633 |
$813,751
17,429,953
kWh
|
$285,681
-
kW-mo/yr
|
- | - | - | |
05 | 3.4111: Use closed cycle process to minimize waste water production | $83,680 | - | - | - |
$83,680
-
gal
|
- | - | |
06 | 3.6112: Use filter and drying oven to reduce sludge volume | $39,860 | $16,000 | - | - | - |
$39,860
-
lb
|
- | |
07 | 3.1291: Eliminate practice of mixing waste streams | $27,200 | - | - | - | - | - | $27,200 | |
08 | 4.231: Purchase equipment instead of leasing | - | $2,410 | - | - | - | - | - | |
TOTAL RECOMMENDED | $1,513,159 | $2,484,121 |
$1,010,836
21,023,154
kWh
|
$351,583
-
kW-mo/yr
|
$83,680
-
gal
|
$39,860
-
lb
|
$27,200 | ||
TOTAL IMPLEMENTED | $113,970 | $6,458 |
$2,629
58,324
kWh
|
$461
-
kW-mo/yr
|
$83,680
-
gal
|
- | $27,200 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs