ITAC Assessment: SD0230
ITAC logo
ITAC Assessment: SD0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product coated steel
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 155
Plant Area 270,000
ft2
Annual Production 200,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,334,868 28,604,045
kWh
Electricity Demand $671,952 69,693
kW-mo/yr
Natural Gas $1,141,365 423,018
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,513,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $113,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,090 $4,048 $2,629
58,324
kWh
$461
-
kW-mo/yr
- - -
02 2.7144: Install spectral reflectors / delamp $2,483 $6,030 $1,360
29,015
kWh
$1,123
-
kW-mo/yr
- - -
03 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $257,414 $480,000 $193,096
3,505,862
kWh
$64,318
-
kW-mo/yr
- - -
04 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $1,099,432 $1,975,633 $813,751
17,429,953
kWh
$285,681
-
kW-mo/yr
- - -
05 3.4111: Use closed cycle process to minimize waste water production $83,680 - - - $83,680
-
gal
- -
06 3.6112: Use filter and drying oven to reduce sludge volume $39,860 $16,000 - - - $39,860
-
lb
-
07 3.1291: Eliminate practice of mixing waste streams $27,200 - - - - - $27,200
08 4.231: Purchase equipment instead of leasing - $2,410 - - - - -
TOTAL RECOMMENDED $1,513,159 $2,484,121 $1,010,836
21,023,154
kWh
$351,583
-
kW-mo/yr
$83,680
-
gal
$39,860
-
lb
$27,200
TOTAL IMPLEMENTED $113,970 $6,458 $2,629
58,324
kWh
$461
-
kW-mo/yr
$83,680
-
gal
- $27,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs