| Assessment Year | 1999 |
|---|---|
| Principal Product | coated steel |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 155 |
| Plant Area |
270,000
ft2
|
| Annual Production | 200,000
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,334,868 | 28,604,045 |
kWh
|
$0.047 |
| Electricity Demand | $671,952 | 69,693 |
kW-mo/yr
|
$9.64 |
| Natural Gas | $1,141,365 | 423,018 |
MMBtu
|
$2.70 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,513,159 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $113,970 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,090 | $4,048 |
$2,629
58,324
kWh
|
$461
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7144: Install spectral reflectors / delamp | $2,483 | $6,030 |
$1,360
29,015
kWh
|
$1,123
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $257,414 | $480,000 |
$193,096
3,505,862
kWh
|
$64,318
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $1,099,432 | $1,975,633 |
$813,751
17,429,953
kWh
|
$285,681
-
kW-mo/yr
|
- | - | - | |
| 05 | 3.4111: Use closed cycle process to minimize waste water production | $83,680 | - | - | - |
$83,680
-
gal
|
- | - | |
| 06 | 3.6112: Use filter and drying oven to reduce sludge volume | $39,860 | $16,000 | - | - | - |
$39,860
-
lb
|
- | |
| 07 | 3.1291: Eliminate practice of mixing waste streams | $27,200 | - | - | - | - | - | $27,200 | |
| 08 | 4.231: Purchase equipment instead of leasing | - | $2,410 | - | - | - | - | - | |
| TOTAL RECOMMENDED | $1,513,159 | $2,484,121 |
$1,010,836
21,023,154
kWh
|
$351,583
-
kW-mo/yr
|
$83,680
-
gal
|
$39,860
-
lb
|
$27,200 | ||
| TOTAL IMPLEMENTED | $113,970 | $6,458 |
$2,629
58,324
kWh
|
$461
-
kW-mo/yr
|
$83,680
-
gal
|
- | $27,200 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs