ITAC Assessment: SD0229
ITAC logo
ITAC Assessment: SD0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Latches and hinges
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 50,000
ft2
Annual Production 40,000
lb
Production Hrs. Annual 5,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,094 1,276,084
kWh
Electricity Demand $39,101 4,397
kW-mo/yr
Electricity Fees $727 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,917

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,875 $2,988 $4,623
60,082
kWh
$1,252
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,528 $10,000 $7,075
92,028
kWh
$9,815
-
kW-mo/yr
$(-3,362.0)
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,665 $500 $1,850
24,033
kWh
$815
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,377 $120 $2,581
31,360
kWh
$796
-
kW-mo/yr
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,502 $11,000 $7,682
99,941
kWh
$9,473
-
kW-mo/yr
$(-3,653.0)
-
MMBtu
- -
06 2.2437: Recover waste heat from equipment $1,372 $540 - - - $1,372
-
gal
-
07 4.651: Install back-up equipment $23,040 $15,000 - - - - $23,040
08 4.445: Install equipment to move product $76,320 $30,000 - - - - $76,320
TOTAL RECOMMENDED $139,679 $70,148 $23,811
307,444
kWh
$22,151
-
kW-mo/yr
$(-7,015.0)
-
MMBtu
$1,372
-
gal
$99,360
TOTAL IMPLEMENTED $11,917 $3,608 $9,054
115,475
kWh
$2,863
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs