ITAC Assessment: SD0227
ITAC logo
ITAC Assessment: SD0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Analytical Intruments
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 60,000
ft2
Annual Production 200
pieces
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,038 757,327
kWh
Electricity Demand $17,554 2,119
kW-mo/yr
Natural Gas $2,690 451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,324 $15,387 $2,990
41,911
kWh
$1,334
-
kW-mo/yr
- -
02 2.7144: Install spectral reflectors / delamp $6,037 $10,200 $4,175
58,617
kWh
$1,862
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,775 $1,374 $759
10,551
kWh
$1,016
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $376 - $146
2,052
kWh
$230
-
kW-mo/yr
- -
05 3.5217: Reuse / recycle/ sell paper products $3,990 - - - $3,990
-
lb
-
06 4.522: Modify storage space to avoid rental of a warehouse $18,000 $6,304 - - - $18,000
TOTAL RECOMMENDED $34,502 $33,265 $8,070
113,131
kWh
$4,442
-
kW-mo/yr
$3,990
-
lb
$18,000
TOTAL IMPLEMENTED $10,465 $16,761 $3,895
54,514
kWh
$2,580
-
kW-mo/yr
$3,990
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs