ITAC Assessment: SD0225
ITAC logo
ITAC Assessment: SD0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product cable assemblies and sheet metal
NAICS
n/a
SIC 3670:
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 106,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,136 1,412,661
kWh
Electricity Demand $26,544 3,546
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,025 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,213

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,757 $13,042 $3,726
55,979
kWh
$1,031
-
kW-mo/yr
-
02 2.7144: Install spectral reflectors / delamp $1,812 $3,000 $1,296
19,343
kWh
$516
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,087 - $759
11,430
kWh
$328
-
kW-mo/yr
-
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $704 $400 $518
7,913
kWh
$186
-
kW-mo/yr
-
05 2.7111: Reduce illumination to minimum necessary levels $3,845 $240 $3,163
47,479
kWh
$682
-
kW-mo/yr
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $11,820 - - - $11,820
TOTAL RECOMMENDED $24,025 $16,682 $9,462
142,144
kWh
$2,743
-
kW-mo/yr
$11,820
TOTAL IMPLEMENTED $22,213 $13,682 $8,166
122,801
kWh
$2,227
-
kW-mo/yr
$11,820
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs