ITAC Assessment: MA0075
ITAC logo
ITAC Assessment: MA0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CORRUGATED BOARDS,CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area
n/a
Annual Production 310,000
thousand feet
Production Hrs. Annual 4,320
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,679 1,038,980
kWh
Fuel Oil #6 $75,625 17,678
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $482 $300 $482
6,448
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,147 - $2,147
28,722
kWh
-
03 2.2136: Install / repair insulation on steam lines $565 $1,136 - $565
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,271 $119 $1,271
16,999
kWh
-
05 2.4312: Improve lubrication practices $1,753 $300 $1,753
23,447
kWh
-
06 2.4133: Use most efficient type of electric motors $789 $800 $789
10,551
kWh
-
07 2.2437: Recover waste heat from equipment $1,134 $1,075 $(-22.0)
(-293)
kWh
$1,156
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,014 $7,500 $2,914
38,980
kWh
$100
-
MMBtu
TOTAL RECOMMENDED $11,155 $11,230 $9,334
124,854
kWh
$1,821
-
MMBtu
TOTAL IMPLEMENTED $6,773 $10,630 $4,952
66,237
kWh
$1,821
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs