| Assessment Year | 1999 |
|---|---|
| Principal Product | aerospace composites |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
54,000
ft2
|
| Annual Production | 2,000
pieces
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $79,543 | 1,038,687 |
kWh
|
$0.077 |
| Electricity Demand | $34,550 | 3,671 |
kW-mo/yr
|
$9.41 |
| Natural Gas | $5,550 | 982 |
MMBtu
|
$5.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $67,289 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,768 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,177 | $3,752 |
$1,620
21,102
kWh
|
$557
-
kW-mo/yr
|
- | - | |
| 02 | 2.7144: Install spectral reflectors / delamp | $3,218 | $3,060 |
$2,380
31,067
kWh
|
$838
-
kW-mo/yr
|
- | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $50,303 | $11,995 |
$21,621
282,239
kWh
|
$28,682
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,107 | - |
$425
5,569
kWh
|
$682
-
kW-mo/yr
|
- | - | |
| 05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,560 | $1,560 | - | - | - | $1,560 | |
| 06 | 3.8211: Convert to aqueous cleaning system | $1,922 | $1,922 | - | - |
$1,922
-
gal
|
- | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,002 | - | - |
$7,002
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $67,289 | $22,289 |
$26,046
339,977
kWh
|
$37,761
-
kW-mo/yr
|
$1,922
-
gal
|
$1,560 | ||
| TOTAL IMPLEMENTED | $13,768 | $7,234 |
$2,045
26,671
kWh
|
$8,241
-
kW-mo/yr
|
$1,922
-
gal
|
$1,560 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs