ITAC Assessment: SD0221
ITAC logo
ITAC Assessment: SD0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product aerospace composites
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 54,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,543 1,038,687
kWh
Electricity Demand $34,550 3,671
kW-mo/yr
Natural Gas $5,550 982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,177 $3,752 $1,620
21,102
kWh
$557
-
kW-mo/yr
- -
02 2.7144: Install spectral reflectors / delamp $3,218 $3,060 $2,380
31,067
kWh
$838
-
kW-mo/yr
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $50,303 $11,995 $21,621
282,239
kWh
$28,682
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,107 - $425
5,569
kWh
$682
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,560 $1,560 - - - $1,560
06 3.8211: Convert to aqueous cleaning system $1,922 $1,922 - - $1,922
-
gal
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,002 - - $7,002
-
kW-mo/yr
- -
TOTAL RECOMMENDED $67,289 $22,289 $26,046
339,977
kWh
$37,761
-
kW-mo/yr
$1,922
-
gal
$1,560
TOTAL IMPLEMENTED $13,768 $7,234 $2,045
26,671
kWh
$8,241
-
kW-mo/yr
$1,922
-
gal
$1,560
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs