ITAC Assessment: SD0209
ITAC logo
ITAC Assessment: SD0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Carbon fiber golf shafts
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 75,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 6,326
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,869 3,080,012
kWh
Electricity Demand $143,405 9,778
kW-mo/yr
Natural Gas $12,713 1,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $758,189 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,546

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $177,242 $44,000 $113,868
2,277,843
kWh
$63,374
-
kW-mo/yr
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,718 $2,500 $3,341
66,823
kWh
$2,377
-
kW-mo/yr
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $1,717 $1,000 $1,248
24,912
kWh
$469
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $1,228 - $594
12,016
kWh
$634
-
kW-mo/yr
- -
05 3.7131: Use a rag recycle service $10,318 $1,200 - - $10,318
-
lb
-
06 4.111: Add equipment/ operators to reduce production bottleneck $331,304 $21,000 - - - $331,304
07 4.111: Add equipment/ operators to reduce production bottleneck $108,568 $13,000 - - - $108,568
08 4.111: Add equipment/ operators to reduce production bottleneck $22,000 - - - - $22,000
09 4.111: Add equipment/ operators to reduce production bottleneck $89,794 $81,000 - - - $89,794
10 4.111: Add equipment/ operators to reduce production bottleneck $10,300 $8,000 - - $10,300
-
lb
-
TOTAL RECOMMENDED $758,189 $171,700 $119,051
2,381,594
kWh
$66,854
-
kW-mo/yr
$20,618
-
lb
$551,666
TOTAL IMPLEMENTED $11,546 $1,200 $594
12,016
kWh
$634
-
kW-mo/yr
$10,318
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs