Assessment Year | 1998 |
---|---|
Principal Product | Carbon fiber golf shafts |
NAICS |
n/a
|
SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
75,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 6,326
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $154,869 | 3,080,012 |
kWh
|
$0.050 |
Electricity Demand | $143,405 | 9,778 |
kW-mo/yr
|
$14.67 |
Natural Gas | $12,713 | 1,810 |
MMBtu
|
$7.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $758,189 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,546 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $177,242 | $44,000 |
$113,868
2,277,843
kWh
|
$63,374
-
kW-mo/yr
|
- | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,718 | $2,500 |
$3,341
66,823
kWh
|
$2,377
-
kW-mo/yr
|
- | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,717 | $1,000 |
$1,248
24,912
kWh
|
$469
-
kW-mo/yr
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,228 | - |
$594
12,016
kWh
|
$634
-
kW-mo/yr
|
- | - | |
05 | 3.7131: Use a rag recycle service | $10,318 | $1,200 | - | - |
$10,318
-
lb
|
- | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $331,304 | $21,000 | - | - | - | $331,304 | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $108,568 | $13,000 | - | - | - | $108,568 | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $22,000 | - | - | - | - | $22,000 | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $89,794 | $81,000 | - | - | - | $89,794 | |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $10,300 | $8,000 | - | - |
$10,300
-
lb
|
- | |
TOTAL RECOMMENDED | $758,189 | $171,700 |
$119,051
2,381,594
kWh
|
$66,854
-
kW-mo/yr
|
$20,618
-
lb
|
$551,666 | ||
TOTAL IMPLEMENTED | $11,546 | $1,200 |
$594
12,016
kWh
|
$634
-
kW-mo/yr
|
$10,318
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs