Assessment Year 1998
Principal Product Aerospace and automotive seals
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 60,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,880 1,527,257
kWh
Electricity Demand $37,018 4,191
kW-mo/yr
Natural Gas $3,158 442
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,582 $750 $1,247
16,413
kWh
$335
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $2,572 $4,900 $1,589
20,809
kWh
$983
-
kW-mo/yr
- -
03 2.2442: Preheat combustion air with waste heat $2,756 $1,182 - - $2,756
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,118 $16,039 $4,574
60,082
kWh
$1,544
-
kW-mo/yr
- -
05 2.7144: Install spectral reflectors / delamp $17,565 $11,460 $13,622
179,367
kWh
$3,943
-
kW-mo/yr
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,118 $8,500 - - - $4,118
07 3.1161: Eliminate/reduce an operation $71,300 - - - - $71,300
TOTAL RECOMMENDED $106,011 $42,831 $21,032
276,671
kWh
$6,805
-
kW-mo/yr
$2,756
-
MMBtu
$75,418
TOTAL IMPLEMENTED $17,146 $31,371 $7,410
97,304
kWh
$2,862
-
kW-mo/yr
$2,756
-
MMBtu
$4,118
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs