Assessment Year | 1998 |
---|---|
Principal Product | Wooden Venetian Blinds |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
75,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 2,440
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,021 | 801,290 |
kWh
|
$0.13 |
Electricity Demand | $37,749 | 4,643 |
kW-mo/yr
|
$8.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $102,096 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,039 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,243 | $9,800 |
$3,221
41,911
kWh
|
$2,022
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,483 | $550 |
$936
12,309
kWh
|
$547
-
kW-mo/yr
|
- | - | |
03 | 2.4131: Size electric motors for peak operating efficiency | $23,506 | $7,400 |
$15,116
196,366
kWh
|
$8,390
-
kW-mo/yr
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $588 | $207 |
$1,097
14,361
kWh
|
$(-509.0)
-
kW-mo/yr
|
- | - | |
05 | 2.6123: Remove unneeded service lines to eliminate potential leaks | $866 | $125 |
$547
7,034
kWh
|
$319
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,358 | $17,300 |
$2,802
36,342
kWh
|
$1,556
-
kW-mo/yr
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,809 | $14,150 |
$1,841
24,033
kWh
|
$968
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $259 | $916 |
$173
2,345
kWh
|
$86
-
kW-mo/yr
|
- | - | |
09 | 2.7144: Install spectral reflectors / delamp | $178 | $180 |
$119
1,465
kWh
|
$59
-
kW-mo/yr
|
- | - | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,600 | $8,500 | - | - | $2,600 | - | |
11 | 3.1182: Make a new by-product | $5,100 | - | - | - | - | $5,100 | |
12 | 3.1162: Use less wasteful packaging | $5,600 | - | - | - | - | $5,600 | |
13 | 3.5313: Increase amount of waste recovered for resale | $2,550 | - | - | - | $2,550 | - | |
14 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,674 | $3,980 | - | - | $4,674 | - | |
15 | 3.2176: Increase use of automation | $3,258 | $3,300 | - | - | $3,258 | - | |
16 | 3.2176: Increase use of automation | $39,024 | $6,000 | - | - | $39,024 | - | |
TOTAL RECOMMENDED | $102,096 | $72,408 |
$25,852
336,166
kWh
|
$13,438
-
kW-mo/yr
|
$52,106 | $10,700 | ||
TOTAL IMPLEMENTED | $11,039 | $20,098 |
$5,974
77,960
kWh
|
$2,465
-
kW-mo/yr
|
$2,600 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs