ITAC Assessment: SD0198
ITAC logo
ITAC Assessment: SD0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wooden Venetian Blinds
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 75,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,440
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,021 801,290
kWh
Electricity Demand $37,749 4,643
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $5,243 $9,800 $3,221
41,911
kWh
$2,022
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,483 $550 $936
12,309
kWh
$547
-
kW-mo/yr
- -
03 2.4131: Size electric motors for peak operating efficiency $23,506 $7,400 $15,116
196,366
kWh
$8,390
-
kW-mo/yr
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $588 $207 $1,097
14,361
kWh
$(-509.0)
-
kW-mo/yr
- -
05 2.6123: Remove unneeded service lines to eliminate potential leaks $866 $125 $547
7,034
kWh
$319
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,358 $17,300 $2,802
36,342
kWh
$1,556
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,809 $14,150 $1,841
24,033
kWh
$968
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $259 $916 $173
2,345
kWh
$86
-
kW-mo/yr
- -
09 2.7144: Install spectral reflectors / delamp $178 $180 $119
1,465
kWh
$59
-
kW-mo/yr
- -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,600 $8,500 - - $2,600 -
11 3.1182: Make a new by-product $5,100 - - - - $5,100
12 3.1162: Use less wasteful packaging $5,600 - - - - $5,600
13 3.5313: Increase amount of waste recovered for resale $2,550 - - - $2,550 -
14 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,674 $3,980 - - $4,674 -
15 3.2176: Increase use of automation $3,258 $3,300 - - $3,258 -
16 3.2176: Increase use of automation $39,024 $6,000 - - $39,024 -
TOTAL RECOMMENDED $102,096 $72,408 $25,852
336,166
kWh
$13,438
-
kW-mo/yr
$52,106 $10,700
TOTAL IMPLEMENTED $11,039 $20,098 $5,974
77,960
kWh
$2,465
-
kW-mo/yr
$2,600 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs