ITAC Assessment: SD0189
ITAC logo
ITAC Assessment: SD0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Commercial Refrigerants
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 1,000,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 8,652
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $563,423 12,332,063
kWh
Electricity Demand $196,085 18,795
kW-mo/yr
Natural Gas $5,700 705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $764,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $23,155 $22,250 $17,254
375,147
kWh
$5,901
-
kW-mo/yr
- -
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $543,061 $1,420,250 $491,520
10,688,160
kWh
$154,572
-
kW-mo/yr
$(-103,031.0)
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,455 $6,625 $1,692
36,928
kWh
$1,763
-
kW-mo/yr
- -
04 2.2515: Use optimum thickness insulation $678 $219 $516
11,137
kWh
$162
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,587 $5,358 $2,629
57,151
kWh
$958
-
kW-mo/yr
- -
06 2.7144: Install spectral reflectors / delamp $4,788 $5,180 $2,786
60,668
kWh
$2,002
-
kW-mo/yr
- -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,780 $8,500 - - - $5,780
08 2.1223: Install smaller boiler (increase high fire duty cycle) $180,000 $27,000 - - $180,000
-
MMBtu
-
TOTAL RECOMMENDED $764,504 $1,495,382 $516,397
11,229,191
kWh
$165,358
-
kW-mo/yr
$76,969
-
MMBtu
$5,780
TOTAL IMPLEMENTED $33,200 $36,327 $20,399
443,435
kWh
$7,021
-
kW-mo/yr
- $5,780
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs