| Assessment Year | 1998 |
|---|---|
| Principal Product | Steel Office Cabinets |
| NAICS |
n/a
|
| SIC | 2522: Office Furniture, Except Wood |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
120,000
ft2
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 5,050
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $159,168 | 2,339,390 |
kWh
|
$0.068 |
| Electricity Demand | $47,854 | 5,418 |
kW-mo/yr
|
$8.83 |
| Natural Gas | $116,715 | 21,392 |
MMBtu
|
$5.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $83,792 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,093 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,357 | $3,530 |
$762
11,137
kWh
|
$595
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.6218: Turn off equipment when not in use | $1,716 | - |
$1,319
19,343
kWh
|
$397
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $5,665 | $1,180 | - | - |
$5,665
-
MMBtu
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,973 | $500 |
$2,288
33,705
kWh
|
$685
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $928 | $1,853 |
$611
9,086
kWh
|
$317
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.7144: Install spectral reflectors / delamp | $2,785 | $5,115 |
$1,768
22,567
kWh
|
$1,017
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $64,806 | $732 | - | - | - | - |
$64,806
-
lb
|
- | |
| 08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,050 | $9,000 | - | - | - | - | - | $3,050 | |
| 09 | 3.4113: Treat and reuse rinse waters | $512 | $450 | - | - | - |
$512
-
Tgal
|
- | - | |
| TOTAL RECOMMENDED | $83,792 | $22,360 |
$6,748
95,838
kWh
|
$3,011
-
kW-mo/yr
|
$5,665
-
MMBtu
|
$512
-
Tgal
|
$64,806
-
lb
|
$3,050 | ||
| TOTAL IMPLEMENTED | $11,093 | $19,998 |
$5,429
76,495
kWh
|
$2,614
-
kW-mo/yr
|
- | - | - | $3,050 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs