Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Multi-layer printed circuit boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 82,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 7,803
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $410,023 5,746,190
kWh
Electricity Demand $107,968 14,246
kW-mo/yr
Natural Gas $60,447 26,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $122,797

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $6,578 $9,930 $5,027
70,926
kWh
$1,551
-
kW-mo/yr
- - - -
02 2.1224: Replace boiler $19,420 $83,000 - - $19,420
-
MMBtu
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $6,154 $3,900 - - $6,154
-
MMBtu
- - -
04 2.2515: Use optimum thickness insulation $3,056 $2,170 - - $3,056
-
MMBtu
- - -
05 2.2515: Use optimum thickness insulation $1,916 $720 - - $1,916
-
MMBtu
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,318 $6,500 $2,893
40,739
kWh
$1,425
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,228 $13,068 $5,418
76,202
kWh
$810
-
kW-mo/yr
- - - -
08 2.7144: Install spectral reflectors / delamp $17,960 $11,180 $15,559
219,226
kWh
$2,401
-
kW-mo/yr
- - - -
09 3.6112: Use filter and drying oven to reduce sludge volume $4,758 $3,000 - - - - $4,758
-
lb
-
10 3.5248: Separate and recycle scrap metal to foundry or for sale $5,045 - - - - - - $5,045
11 3.4115: Recover and reuse cooling water $3,300 $2,000 - - - $3,300
-
gal
- -
12 4.444: Install system to collect scrap $69,638 $20,000 - - - - - $69,638
TOTAL RECOMMENDED $148,371 $155,468 $28,897
407,093
kWh
$6,187
-
kW-mo/yr
$30,546
-
MMBtu
$3,300
-
gal
$4,758
-
lb
$74,683
TOTAL IMPLEMENTED $122,797 $68,568 $28,897
407,093
kWh
$6,187
-
kW-mo/yr
$4,972
-
MMBtu
$3,300
-
gal
$4,758
-
lb
$74,683
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs