Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Paints, Thinners, and coatings
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 272,500
ft2
Annual Production 2,800
Tgal
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,164 3,227,433
kWh
Electricity Demand $88,121 9,090
kW-mo/yr
Natural Gas $12,239 2,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,218,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,172,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,603 $500 $2,689
47,186
kWh
$914
-
kW-mo/yr
- - -
02 2.2449: Recover heat from exhausted steam, hot air or hot water $4,017 $1,000 - - $4,017
-
MMBtu
- -
03 2.7224: Reduce space conditioning during non-working hours $3,910 $500 - - $3,910
-
MMBtu
- -
04 2.1221: Replace obsolete burners with more efficient ones $1,214 $2,500 - - $1,214
-
MMBtu
- -
05 3.3125: Use distillation, evaporation to remove contaminants $46,200 $100,000 - - - $46,200
-
gal
-
06 3.8224: Convert to less toxic hydrocarbon cleaners $14,130 - - - - $14,130
-
gal
-
07 2.4321: Upgrade obsolete equipment $1,145,482 $644,000 - - - - $1,145,482
TOTAL RECOMMENDED $1,218,556 $748,500 $2,689
47,186
kWh
$914
-
kW-mo/yr
$9,141
-
MMBtu
$60,330
-
gal
$1,145,482
TOTAL IMPLEMENTED $1,172,356 $648,500 $2,689
47,186
kWh
$914
-
kW-mo/yr
$9,141
-
MMBtu
$14,130
-
gal
$1,145,482
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs