ITAC Assessment: SD0168
ITAC logo
ITAC Assessment: SD0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Polyethylene bags for agriculture, food, medical, etc...
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 60,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $324,041 6,558,031
kWh
Electricity Demand $203,094 12,275
kW-mo/yr
Natural Gas $8,824 1,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,087

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $14,434 $10,890 $9,799
199,883
kWh
$4,635
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,495 $71,900 $35,827
731,243
kWh
$16,668
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $958 $1,100 $551
11,137
kWh
$407
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,736 $7,712 $5,652
115,475
kWh
$3,084
-
kW-mo/yr
- -
05 2.7144: Install spectral reflectors / delamp $3,294 $2,680 $1,847
37,808
kWh
$1,447
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $1,610 $943 $829
16,999
kWh
$781
-
kW-mo/yr
- -
07 3.8224: Convert to less toxic hydrocarbon cleaners $6,476 - - - $6,476
-
gal
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,960 $9,000 - - - $2,960
09 4.441: Install automatic packing equipment $15,600 $9,000 - - - $15,600
TOTAL RECOMMENDED $106,563 $113,225 $54,505
1,112,545
kWh
$27,022
-
kW-mo/yr
$6,476
-
gal
$18,560
TOTAL IMPLEMENTED $100,087 $113,225 $54,505
1,112,545
kWh
$27,022
-
kW-mo/yr
- $18,560
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs